Laserfiche WebLink
Feed Hopper Leach Circuit <br /> r-- <br /> 96% 54.30-226 <br /> ADD <br /> CN <br /> Trommei Jaw Crusher 1 <br /> I <br /> 95°1° 27.15-1.43 95% 27.15-1.43 1 <br /> I <br /> 1 1 Holding Tank <br /> Screen Cone Crusher 7. 1 40% 20.00-30.00 40%° 20.00-30.00 <br /> 95% 33.94-1.79 95% 6.79.0.36 <br /> I I I <br /> I LIME 1 <br /> I I I <br /> Fine Ore Bin 20. Filter Press <br /> r------------ <br /> ] 95% 27.15-1.43 ( 1 40% 20.00-30.00 <br /> I 9. 1 1 I <br /> -----------1 I I 1 <br /> Ball Mill Pregnant Tank <br /> ( 57% 18.58-13.84 113.[UIF(50%)13.58-13.58] ( 0% 0.00 <br /> L_--__-_-_-_ Cyclones I 1 I <br /> 25.6%45.73-136.35 1 32. 1 D.E. <br /> I I 1 I I 'CDND <br /> Sump 1 I I I I <br /> 25.6% 45.73-136.35 I I L33.- Sump __ Clarifier <br /> I 14.[Cyclone 019 I 0% 0.00-15.00 0% 0.00-30.00 <br /> FLOC <br /> Thickener 1 I <br /> --J �------- <br /> 182% 20.00.89.72 25.1 <br /> [OIF(0%)0.00-7 3.36) Repulp Tank Yaccum <br /> 40% 20.00-30.00 L 0% 0.00-30.00 <br /> I 1 I Zn Powder <br /> I� ..`. DE precoat e <br /> i (trace _- Filter Press <br /> Detox Tank (0%)0.00-30.00 <br /> tg <br /> 40% 20.00-30.00 Lime <br /> 0 fe2S3 <br /> Process Water I Borax <br /> 0% 0-13.33 Recycle Water 1 Furnance 140 <br /> KNO3 <br /> Au- Dore Na2CO3 <br /> Legendlq_zl <br /> Cafe <br /> Solids Make-Up Water <br /> Water 01/° 0-6.67 Tailings <br /> Slurry - - - - - - - 75% 20DO-6.67 <br /> Recycled Water <br /> Figure 4-1 <br /> [(a%), b-c] <br /> CJK Milling LLC <br /> a =%solid, b=tph solids,c=tph water Leadville Mill Flowsheet and Material Balance <br />