My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-02_REVISION - M1990057 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990057
>
2021-03-02_REVISION - M1990057 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 4:53:29 AM
Creation date
3/5/2021 8:23:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
REVISION
Doc Date
3/2/2021
Doc Name Note
Part 2 of 3
Doc Name
Request For Amendment To Permit
From
CJK Milling Company, LLC
To
DRMS
Type & Sequence
AM2
Email Name
DMC
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Leadville Mill M 1990-057 <br /> EXHIBIT C—MILL PLAN <br /> Page 4-30 <br /> • Liner material contractor will inspect the substrate and anchor trenching prior <br /> to commencing installation. <br /> • Panel installation will occur in reasonably clam weather conditions with <br /> ambient temperatures in excess of 407 and no precipitation. <br /> • Sample seams will be made on a daily basis to establish a proper film bond tear. <br /> • Seaming crews will overlap the material ±6in and construct a minimum tin <br /> wide fully bonded seam without wrinkles or voids. <br /> • If wrinkles occur, the seam will be cut and patched accordingly, a minimum of <br /> 4in beyond the problem seam in all directions. <br /> • Field seams will be tested by the air-lance method per ASTM Method D4437. <br /> Where visual or audible signs occur, the area will be repaired. <br /> • Destructive samples will be taken every 1,000 liner-feet of seam from the <br /> material in the trench area. At least 2 samples will be taken if less than 2,000If <br /> of seam installed. <br /> • Destructive samples will be sent to a lab for testing (peel and shear). The test <br /> values will be a minimum of 80% of parent material strength. <br /> • The liner contractor shall supply daily reports to the Owner. <br /> LINER STABILIZATION, HISTORIC TAILINGS PLACEMENT. SLOPE BALLAST <br /> INSTALLATION <br /> • Performed by Owner, monitored by Mill Superintendent and/or Owner's <br /> Engineer. <br /> TAILINGS SLURRY PIPING. DECANT WATER PUMPS <br /> • Performed by Owner, monitored by Mill Superintendent and/or Owner's <br /> Engineer. <br /> 4.3. 10 CONSTRUCTION SCHEDULE (6.3.3(2)(b)) <br /> The following activities will be completed in the Spring 2021. <br /> The proposed construction schedule for the TSF follows. Reference QA/QC plan for <br /> additional details on the listed activities. UMC will provide the Division 48hr notice on <br /> the CORMS inspections. UMC will also provide the Division 48hr notice on the optional <br />
The URL can be used to link to this page
Your browser does not support the video tag.