My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-02_REVISION - M1990057 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990057
>
2021-03-02_REVISION - M1990057 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 4:53:29 AM
Creation date
3/5/2021 8:23:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
REVISION
Doc Date
3/2/2021
Doc Name Note
Part 2 of 3
Doc Name
Request For Amendment To Permit
From
CJK Milling Company, LLC
To
DRMS
Type & Sequence
AM2
Email Name
DMC
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Meadville Mill M 1990-057 <br /> EXHIBIT C-MILL PLAN <br /> Page 4-19 <br /> Table DAF 30 appFeNimately 2.31b/day will be added as a fleeeulent (same Feagent as <br /> used the coneentFate thiekeneF). <br /> T cBEE4-4: CHEMIGAL USAGE, ThILINGs THIGKENER <br /> Reagents OAF-30 <br /> Rate A-998�.� <br /> . /..- <br /> TOTTTCCCI TTVJO�CryT <br /> flewnt Used Q944Y <br /> 1 Reagent Fate based en dFy tailings feed tennage !1 <br /> 2:Fens of. <br /> 4.3 TAILINGS STORAGE FACILITY (TSF) (6 .3 .3(2)(b)) <br /> Note: TSF earthworks were completed in 2014. The remaining TSF construction will <br /> be completed in Spring 2021. <br /> The current mill configuration, process and operations have been modified to treat an <br /> ore different than was processed during the last operational period, as described in <br /> Section 4.2. This necessitates rephrasing the initial TSF plan to provide tailings disposal <br /> capacity for a more efficient concentrating system and increased tails reporting to <br /> the TSF. The historical TSF embankment compaction was inadequate for current <br /> production requiring complete removal of the existing embankment and <br /> reconstruction of the TSF facility with a lined facility. <br /> The reconstruction honors the original permit parameters as follows: <br /> • The same 4.6ac TSF is utilized. <br /> • The pond excavation at a maximum 21ft depth does not impact the known <br /> aquifers at 80-100ft below the surface. <br /> • The TSF embankment will be constructed from available onsite soils borrowed <br /> from the tailings disposal area as outlined in the recommendation of CTL <br /> Thompson, Inc., Permeability Study, April 10, 1990, presented as Appendix 15- <br /> 2, and Slope Stability Evaluation,July 8, 2011, presented as Appendix 15-5. <br /> • The TSF will be constructed as a zero-discharge facility with 3ft of freeboard in <br /> accordance with the Probable Maximum Precipitation Estimates - United <br /> States between the Continental Divide and the 103rd Meridian. <br />
The URL can be used to link to this page
Your browser does not support the video tag.