My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-02_REVISION - M1990057 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990057
>
2021-03-02_REVISION - M1990057 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 4:53:29 AM
Creation date
3/5/2021 8:23:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
REVISION
Doc Date
3/2/2021
Doc Name Note
Part 2 of 3
Doc Name
Request For Amendment To Permit
From
CJK Milling Company, LLC
To
DRMS
Type & Sequence
AM2
Email Name
DMC
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Lead lle Mill M 1990-057 <br /> EXHIBIT C—MILL PLAN <br /> Page 4-12 <br /> Xanthate T89 939A 4446 256I( FU FH) 2 dFUFAS <br /> PlfleGil 4a i9696 746 286 119(dFUR14 2 dFUFAS <br /> Fleeewlen+ e/a 95% 1.3 lb 286l*um) 1 dFUFFR5 <br /> r,..peF S..ic...-..,, C+6G4 19096 32-Ib b84+ba94 &43t <br /> No less than 9 en of lime will be a site at anygiven time fee PUFpeses of dete)(ifeeatien <br /> 8 <br /> stli33p built inte the EenEFetefleef-at the leweFend of the mill .The Eentainmentt-Sump <br /> TSF facility. <br /> 4.2.5 SOLUTION MANAGEMENT <br /> Spill containment in the mill building will be accomplished by; first localizing <br /> containment and clean-up, and second by directing any remaining spill to the sump <br /> build into the concrete floor and located at the lower end of the building. I,,,—the <br /> the walls aFe sealed to the base-ef the sump. <br /> Liquid quantities of reagent in use at one time are small (see Table 4-) to minimize risk <br /> due to spillage and waste. Chemicals not needed immediately, will be stored in Over- <br /> pack Barrel containers. The reagent mixing area is at the fine ore bin level. Any spillage <br /> not cleaned up at the source will be washed down to the sump. If chemical laden <br /> water gets to the sump, it can be pumped up to the tailings trough which will flow to <br /> will be pumped to the TSF (see Figure 6-2) to mix and dilute with the water decanting <br /> from the tailings in-the TSF.9 <br /> Operation solution volumes are summarized in Table 4-11. Primary containment, <br /> representing tanks and facilities used in the operation, amounts to approximately <br /> 14,000-328,900-gal. Secondary containment consists of the sump and is located at the <br /> lower level of the mill building. The sump area can hold about 69A 5,000gal of the <br /> tanks and facilities located within the mill building. In the event of 100% primary <br /> containment failure, the TSF will serve as the tertiary containment facility. The <br /> maximum capacity of the TSF assumes a 3ft freeboard. The first 1ft of the freeboard <br /> (500,000ga!} 425,000 gal represents the tertiary capacity of the TSF. Tertiary <br /> containment therefore, represents over 35 times all primary containment facilities.10 <br /> 8 A1AR1Q43 <br /> 9 A1AR1Q9 <br /> 10 A1AR1Q13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.