Laserfiche WebLink
The Leadville Mill M 1990-057 <br /> EXHIBIT C-MILL PLAN <br /> Page 4-8 <br /> orange-colored numbers in the Figure 4-1 flowsheet. Note the operational changes <br /> when the trommel/crusher is not operating (green shading). <br /> TABLE 4-5: PROCESS MATERIAL BALANCE <br /> Stream Description Solids TPH Slurry <br /> (/) Solids Water (gpm) <br /> 1 RoM Ore 96.0% 54.30 2.26 <br /> 2 Trommel Oversize 95.0% 27.15 1.43 - <br /> 3 Trommel Fines 18.0% 27.15 123.01 537.57 <br /> 4 Primary Crusher Product 95.0% 27.15 1.43 - <br /> 5 Feed to Screen 95.0% 33.94 1.79 <br /> 6 Screen Oversize 95.0% 6.79 0.36 <br /> 7 Secondar Crusher Product 95.0% 6.79 0.36 <br /> 8 Feed to Storage Bin 95.0% 27.15 1.43 <br /> 9 Fine Ore Bin discharge 95.0% 5.00 0.26 <br /> 9 Fine Ore Bin discharge 95.0% 11.90 0.63 - <br /> 10 Ball Mill Feed 57.0% 18.58 13.84 83.98 <br /> 10 Ball Mill Feed 95.0% 11.90 0.63 - <br /> 11 Ball Mill Discharge 57.0% 18.58 13.84 83.98 <br /> 11 Ball Mill Discharge 65.0% 23.80 12.82 86.87 <br /> 12 Cyclone Feed 25.6% 45.73 136.35 591.29 <br /> 12 Cyclone Feed 40.0% 23.80 35.70 178.95 <br /> 13 Cyclone Underflow 50.0% 13.58 13.58 74.82 <br /> 13 Cyclone Underflow 65.0% 11.90 6.40 43.43 <br /> 14 Cyclone Overflow 20.7% 32.15 123.27 530.80 <br /> 14 Cyclone Overflow 28.8% 11.90 29.30 134.83 <br /> 14 Thickener Feed 18.2% 20.00 89.72 396.00 <br /> 15 Thickener O/F - - 73.36 238.54 <br /> 16 Thickener U/F 40.0% 20.00 30.00 150.40 <br /> 17 Leach Circuit Feed 40.0% 20.00 30.00 150.40 <br /> 18 Leach Circuit Discharge 40.0% 20.00 30.00 150.40 <br /> 19 Holding Tank 40.0% 20.00 30.00 150.40 <br /> 20 Pressure Filter Cake 80.0% 20.00 5.00 20.00 <br /> 21 Pregnant Solution - - 30.00 120.00 <br /> 22 Feed to Merrill Crowe 30.00 120.00 <br /> 23 Barren Solution - 30.00 120.00 <br /> 24 Gold Precipitate - 0.12 trace - <br /> 25 Repulp Tank 50.0% 20.00 20.00 110.20 <br /> 26 Drum Filter Feed 50.0% 20.00 20.00 110.20 <br /> 27 Filtrate - - 13.33 53.32 <br /> 28 Leach Residue 75.0% 20.00 6.67 55.20 <br /> 29 Process Water - - 124.44 - <br /> 30 Process Water 5.75 <br /> 31 Process Water to Sump 22.88 - <br /> 32 Wash Water 5.00 20.00 <br /> 33 Barren Solution 15.00 - <br /> Note: Non-shaded streams denote operation with crusher operation. Shaded streams replaced non-shaded streams <br /> when crusher is not operating <br />