My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-02_REVISION - M1990057 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990057
>
2021-03-02_REVISION - M1990057 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 4:53:29 AM
Creation date
3/5/2021 8:23:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
REVISION
Doc Date
3/2/2021
Doc Name Note
Part 2 of 3
Doc Name
Request For Amendment To Permit
From
CJK Milling Company, LLC
To
DRMS
Type & Sequence
AM2
Email Name
DMC
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Leadville Mill M 1990-057 <br /> EXHIBIT C—MILL PLAN <br /> Page 4-4 <br /> TABLE 4-1: LEADVILLE MILL, DESIGN CRITERIA <br /> Item Design Parameter value I Unit <br /> Physical Parameters <br /> 1 RoM Moisture 4% - <br /> 2 Plant Capacity 400 dstpd <br /> 3 Plant Availability 92% - <br /> 4 Calculated Capacity 453 dstpd <br /> Crushing Circuit <br /> 5 Operating Hours 8 hr/day <br /> 6 Availability 75% <br /> 7 Trommel Fines 50% <br /> 8 Feed Rate 50% % <br /> 277.8 stpd <br /> 31.7 stph <br /> 9 RoM Feed, F80 102 mm <br /> 10 Crusher Product, P80 12.5 mm <br /> 11 Fine Ore in Capacity 280 stpd <br /> Mill Circuit <br /> 12 Ball Mill Work Index(BWi) 15.45 - <br /> 13 Mill Feed, F80 12,500 micron <br /> 14 Mill Product, P80(cyclone 0/F) 104 micron <br /> Leach Circuit <br /> 15 Thickener Feed 30% solids <br /> 16 Leach Feed 40% solids <br /> 17 Leach Time 18/24 hours <br /> 18 Feed Solids, Pressure Filter 40% solids <br /> 19 Filtration Rate 500 Ib/ft -hr <br /> 20 Filtration Product 80% solids <br /> 21 Repulp Tank 50% solids <br /> 22 Detox Tank 50% solids <br /> 4 hours <br /> 23 Vacuum Filter, Drum 100 Ib/ft -hr <br /> TROMMEL & CRUSHING CIRCUIT <br /> A new crushing building will house the trommel, crusher and screens. Basis of crusher <br /> design includes the following: <br /> • The RoM ore delivered by trucks,weighed, and stored in a 35t-200st capacity <br /> coarse ore bin, (Figure)will be crushed in a two-stage operation to a final size <br /> of about-3/8". A conveyor will move the ore to the 200t fine ore bin located <br /> in the mill building.5 <br /> 5 A1AR1Q7/Q26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.