Laserfiche WebLink
Job Condition Correction Factor Source <br /> Operator Skill: 1.000 (EXCL.) <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 1.000 (DOZ-OC) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.793 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.5924 <br /> Adjusted unit 736.47 LCY/hr <br /> production: <br /> Adjusted fleet 2945.88 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 4 Dozer(s) <br /> Unit cost: $0.526/LCY <br /> Total job time: 0.44 Hours <br /> Total job cost: $680 <br />