My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-02_GENERAL DOCUMENTS - C1981044
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981044
>
2021-03-02_GENERAL DOCUMENTS - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 7:50:50 AM
Creation date
3/3/2021 7:45:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
General Documents
Doc Date
3/2/2021
Doc Name Note
Findings & Cost Estimate (MT8)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Moffat County Mining, LLC
Permit Index Doc Type
Findings
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br /> Task description: Regrade Portal No.5A Facilities Area <br /> Site: Williams Fork Mines Permit Action: 2020 Reclamation Left Permit/Job#: C1981044 <br /> PROJECT IDENTIFICATION <br /> Task#: 008 State: Colorado Abbreviation: None <br /> Date: 12/16/2020 County: Moffat Filename: 007 <br /> User: DC1 <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D10T- IOSU <br /> Horsepower: 574 <br /> Blade Type: Semi-Universal <br /> Attachment: 1-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $170.04 NA <br /> Operating Cost/Hour: $153.03 100 <br /> Ripper own. $22.66 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $1.97 15 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $388.99 <br /> Total Fleet Cost/Hour: $1,555.96 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 290,000 <br /> Swell factor: 1.165 <br /> Loose volume: 337,850 LCY <br /> Source of estimated volume: Table 63;Map 26 <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 200 feet <br /> Unadjusted hourly 946.0 LCY/hr <br /> production: <br /> Materials consistency Compacted fill or embankment 0.9 <br /> description: <br /> Average push 5% <br /> gradient: <br /> Average site altitude: 5,400 feet <br /> Material weight: 2,900 lbs/LCY <br /> Weight description: Decomposed rock-50%Rock,50%Earth <br />
The URL can be used to link to this page
Your browser does not support the video tag.