Laserfiche WebLink
Bottom Plug PVC plug- 12 in. 18" NA 3.00 EA $154.75 $464.25 <br /> - 18"Wells diameter borehole <br /> (2) <br /> -Fill Holes Portland cement 18" NA 917.00 bag $15.95 $14,626.15 <br /> with Cement grout(Bag,material <br /> cost only...94 lb.bag) <br /> -Borehole Borehole NA NA 2.00 EA $35.50 $71.00 <br /> Marker location/identification <br /> marker(EA,material <br /> cost only) <br /> Drill Rig ATLAS COPCO NA NA 248.00 EA $144.96 $35,950.08 <br /> Time-All ROC D7-11,4.0 in. <br /> Wells <br /> Water Truck Water Tanker,3,500 NA NA` 248.00 EA $45.29 $11,231.92 <br /> Time-All Gal. <br /> Wells <br /> -Cut Casing Exposed casing 2 .524 5.76 LF $3.26 $18.78 <br /> 2"Wells removal-Calculate <br /> Circumference in <br /> Linear Feet <br /> -Cut Casing Exposed casing 4 1.05 3.14 LF $3.26 $10.24 <br /> 4"Wells removal-Calculate <br /> Circumference in <br /> Linear Feet <br /> -Cut Casing Exposed casing 6 1.57 7.85 LF $3.26 $25.59 <br /> 6"Wells removal-Calculate <br /> Circumference in <br /> Linear Feet <br /> -Cut Casing Exposed casing 8 2.09 4.19 LF $3.26 $13.66 <br /> 8"Wells removal-Calculate <br /> Circumference in <br /> Linear Feet <br /> -Cut Casing Exposed casing 18 4.71 9.42 LF $3.26 $30.71 <br /> 18"Wells removal-Calculate <br /> Circumference in <br /> Linear Feet <br /> Job Hours: 248.00 Total Cost: $80,297.00 <br />