Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: 000 <br /> Site: Williams Fork Mines Permit Action: 2020 Reclamation Full Permit/Job#: C1981044 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 3/1/2021 County: Moffat Filename: C044-000 <br /> User: DC1 <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 002 Plug and Seal All Wells BOREHOLE 1 248.00 $80,297 <br /> 003 Seal and Backfill All Mine and Vent Shaft Entries MINESEAL 1 200.00 $107,440 <br /> 008 Regrade Portal No. 5A Facilities Area DOZER 4 278.23 $432,916 <br /> 009 Push Gravel and Rock to Box Cut at Portal No. 5A DOZER 4 9.70 $15,021 <br /> 016 Regrade Access Road DOZER 4 0.44 $680 <br /> 031 Regrade Ponds 5-P5,5-P6,5-P7 and Rams SCRAPERI 1 2.47 $2,052 <br /> 032 Regrade Sewage Treatment Ponds 5-P1,5-P2 and DOZER 4 2.97 $4,601 <br /> 5-P3 <br /> 033 Regrade Pond 5A-PI DOZER 1 8.77 $3,016 <br /> 034 Regrade Pond SHP2 DOZER 1 0.32 $110 <br /> 035 Regrade Pond SHP1 DOZER 1 2.60 $893 <br /> 037 Regrade Pond 9-P3 DOZER 1 0.33 $112 <br /> 038 Regrade Pond 9-P1 DOZER 1 0.96 $332 <br /> 040 Regrade Pond 9-P4 DOZER 1 0.11 $38 <br /> 041 Regrade Pond 9-P5 DOZER 1 0.53 $182 <br /> 042 Regrade Pond 9-P6 DOZER 1 3.68 $1,265 <br /> 043 Regrade Pond 9-P7 DOZER 1 0.36 $124 <br /> 044 Regrade Pond 9-P8 DOZER 1 0.47 $113 <br /> 046 Regrade Pond 9A-P2 DOZER 1 1.89 $651 <br /> 048 Regrade Ponds HR-PIA and HR-PIB DOZER 1 10.08 $3,466 <br /> 051 Replace Topsoil from Stockpile to Portal Area SCRAPERI 1 5.71 $4,748 <br /> Refuse Pile <br /> 053 Replace Topsoil from NE Stockpile to Refuse Pile SCRAPERI 1 7.63 $6,350 <br /> 054 Replace Topsoil from#9 Berm to Refuse Pile SCRAPERI 1 0.53 $437 <br /> 059 Replace Topsoil from Stockpile to 7-North Angle DOZER 4 0.13 $197 <br /> Well Area <br /> 061 Replace Topsoil from Stockpile to Access Road SCRAPERI 1 0.57 $472 <br /> 062 Seed Reclaimed Area with Rangeland/Wildlife REVEGE 1 71.00 $105,795 <br /> Mix <br /> 063 Reseed Cropland Areas REVEGE 1 77.00 $86,992 <br /> 064 Reseed Reclaimed Areas with Pasture Mix REVEGE 1 98.00 $119,921 <br /> 065 Weed Spraying- 10%or the Area,Twice/Year REVEGE 1 800.00 $95,561 <br /> for Ten Years <br /> 085 Site Maintenance and Pond Cleaning SITEMAINT 1 400.00 $191,180 <br /> ENANCE <br /> 090 Mobilize/Demobilize Equipment for Initial MOBILIZE 1 6.22 $19,143 <br /> Reclamation <br /> 091 Mobilize/Demobilize Equipment for Pond MOBILIZE 1 6.22 $4,959 <br /> Removal <br />