My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-02_REVISION - M2004078
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004078
>
2021-03-02_REVISION - M2004078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 10:04:55 AM
Creation date
3/3/2021 7:15:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004078
IBM Index Class Name
REVISION
Doc Date
3/2/2021
Doc Name
Request for Technical Revision
From
Denver Water
To
DRMS
Type & Sequence
TR9
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2ECCC6F5-A05F-4CFC-98DE-FA458AF7F640 <br /> �^ 1600 Woo I71h Aw <br /> D Demver.CO 0020A-3412 <br /> DENVER WATER 303, 60 <br /> 303b2800 <br /> DIVISION OF RECLAMATION <br /> February 23, 2021 MINING AND SAFETY <br /> Eric Scott, P.G., R.G <br /> Colorado Division of Reclamation, Mining, and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> RE: M-2004-078, Lupton Lakes Resource, Technical Revision TR-08—Pump Station and Inlet/Outlet Pipeline Location <br /> Revision <br /> Dear Mr. Scott, <br /> Denver Water will construct an inlet/outlet pipeline to the Lupton Lakes Complex that carries water from the South Platte <br /> River to the Southwest corner of the North Cell (Pond 1) in 2021. The pipeline alignment will change the location of the <br /> future pump station from the northwest corner of the South Cell to the southwest corner of the North Cell. The pipeline <br /> will be constructed to ensure access to the South Platte River prior to further development in the area. The pump <br /> station will not be constructed as part of this project and will likely be constructed after 20230. <br /> Denver Water is requesting a Technical Revision, TR-09, to permit M-2004-078. The purpose of the revision is to <br /> amend the location of the pump station and inlet/outlet pipeline, as shown on Sheet 6 on the permit drawings. <br /> Included for your review are the following documents: <br /> 1. A redlined version of Mining Permit M-2004-078 showing the revisions discussed above. <br /> 2. Final for Construction (FFC) Drawings for inlet-outlet pipeline alignment and future pump station location. <br /> Denver Water has completed a Special User Permit with the City of Fort Lupton and have been granted approval from <br /> Dustin Steelman at the Colorado Department of Transportation (CDOT)for the alignment under Highway 85. Denver <br /> Water is working through the formal approval process with CDOT. <br /> This request is in conformance with Section 4.17 of the (DRMS) Rules and Regulations. Please find enclosed a check <br /> in the amount of$216 for application fees. The contents of the technical revision will be sent electronically via email to <br /> expedite the document transfer. <br /> If you have any questions, please contact me at brad.piedea-denverwater.org, or 303-628-6756. <br /> Sincerely, <br /> Bradley D. Piede, P.E. <br /> Dam Safety Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.