Laserfiche WebLink
Amy Eschberger Reference No. 20378105-1-TM-0 ' <br /> Colorado Division of Reclamation, Mining and Safety February 19,2021 <br /> was recorded seven days after the second development. The slow recharge observed in MW-8 and multiple well ' <br /> developments occurring over just several weeks likely means that stable groundwater conditions have not yet <br /> been observed. ' <br /> Table 1: MW-8 Groundwater Measurements <br /> Measurement Date Depth to Groundwater(ft btoc') Groundwater Elevation (ft amsl2) <br /> 12/7/2020 218.6 5031.9 <br /> 12/14/2020 223.7 5026.8 ' <br /> Notes: <br /> 'ft btoc: :feet below top of casing <br /> 2 ft amsl:feet above mean sea level ' <br /> 2.2 Surveying <br /> The well was surveyed by Souder, Miller&Associates on January 13, 2021. The ground and top of casing ' <br /> elevations were collected and the points processed. The groundwater elevations presented in Table 1 were <br /> calculated from the top of casing measurements. <br /> 2.3 Permitting ' <br /> The Notice of Intent to install MW-8 was submitted to the Colorado Division of Water Resources on November 3, <br /> 2020 prior to beginning well installation under MH-61351. The GWS-46 Monitoring Well Construction Permit and ' <br /> GWS-31 Well Construction and Yield Estimate Report are provided as Attachment E and were delivered to the <br /> Colorado DWR on February 4, 2021. <br /> 1 <br /> 1 <br /> GOLDER 4 ' <br />