Laserfiche WebLink
Table D-1 Reclamation Task and Cost Estimate <br /> Reclamation Table <br /> Time <br /> Activity Description Months Cost <br /> Remove All Mining Equipment and Stockpiles 2 $1,000 <br /> Knockdown the mining face at vertical edges to 3:1 Slope 0.1 $2,500 <br /> Final Grading of 3:1 Slopes 1,500 LF 0.2 $2,500 <br /> Topsoil and Grading of pit floor and side slopes=11,000 CY @ 2.00/CY 0.2 $22,000 <br /> Rip Pit Floor and Compacted Areas 0.1 $1,000 <br /> Disc Topsoil, seed, mulch and stabilize mined areas @ $50/Acre 19.93 Acres 0.1 $996.50 <br /> Totals 2.7 $29,996.50 <br /> DRMS Costs (25%x Direct Costs) $7,499.15 <br /> Total Bond Amount $37,495.65 <br />