Laserfiche WebLink
a) Truck traffic: DOT legal trucks will access to and from the site from the existing entrance. <br /> b)Noise: will meet all MSHA regulations as well as requirements of the Gunnison County <br /> Land Use Department. <br /> c) Dust: Although the pit activities will be watered and all operations on the site are regulated by <br /> the Air Quality Control Division of the CDPHE. <br /> d) Visual impact: The mine will be located within the project limits and will be reclaimed at <br /> completion of the job. Significant changes to the property upon completion are not expected. <br /> e) The product from this staging area will positively impact the Highway Construction project by <br /> providing a place for import,processing, and storage of construction aggregates. Due to the <br /> nature of the project, export and import of materials would have been extremely difficult to <br /> manage and the costs would have been excessive, potentially leading to over-runs of the budget <br /> for the project. <br /> f) The hydrological system will detain all runoff so that sediment will not leave the site and <br /> cloud any downstream waters. There will be sanitation facilities located in the Mining Area, <br /> therefore no leach fields or other means of sewage disposal within the Mining Area. <br /> g) The Blue Creek Staging Area will be reclaimed to General Agriculture as shown on Map E3- <br /> 3. The operator will work closely with the County,NRCS, CDPW and the DRMS to ensure that <br /> the reclamation plan is the most appropriate for achieving the post-mining land use. <br />