MINING PLAN EXHIBIT C <br /> 1. General Mining Plan <br /> The permit area will be staked prior to any additional site disturbance. Map E-2 shows the <br /> mining activities. The location of the imported material is shown on Map E-2. Topsoil will be <br /> stripped, and the site will be graded as shown in Map E-2 to accommodate import material <br /> storage, 2 staging yards for job trailers, a crusher location, aggregate stockpiles, borrow area and <br /> topsoil storage. The site will begin to accept material generated from the Blue Creek Highway <br /> Project in the spring 2021. The schedule for the job is 2-3 years,the site will be used for the <br /> duration of the project and reclamation will occur at the completion of the job. <br /> Access to the staging yard will come from the frontage road adjacent to Highway 50 and enter <br /> onto Highway 50 at the existing improved entrance with the project limits. <br /> Topsoil will be salvaged on site and stored for reclamation. Topsoil will be stockpiled along the <br /> northern edge of the permit running north to south in two separate piles as shown in Map E-2. <br /> The operation will run to support the highway project and similar hours of operation are <br /> expected at the site as it supports the project. Excavated product will be stored within the <br /> Mining Area. All final slopes will be mined to 3H:1 V or less to reduce the amount of <br /> reclamation required after mining. The mining areas and stockpiles are shown on Map E-2. <br /> The following list is the best estimate of the required equipment to be used onsite throughout the <br /> mine life: <br /> Gravel Crushing Equipment <br /> • Portable crushing plant <br /> • Water Truck for dust suppression <br /> • Wheel Loader Cat 988, Cat 980 <br /> • Cat D-9 size dozer or equivalent <br /> • Caterpillar Excavator with Thumb <br />