My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-21_PERMIT FILE - C1981010 (16)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2020-12-21_PERMIT FILE - C1981010 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 3:05:17 PM
Creation date
2/25/2021 3:03:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
12/21/2020
Doc Name
Design and Construction Specifications for Haulroads
Section_Exhibit Name
Appendix S
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"SPECIFICATIONS" GENERAL CONDITIONS <br />-~ <br />•' <br />FOR <br />HAULROADS <br />TRAPPER MINE <br />UTAH INTERNATIONAL, INC. <br />CRAIG, COLORADO <br />SCG-O1 General <br />These "Specifications" General Conditions shall have precedence over <br />any clauses in the General Conditions with which they may conflict. <br /> <br />All references in the Contract, General Conditions, "Specifications" <br />General Conditions and technical provisions of the Specifications to <br />"General Conditions" shall be understood to include modifications <br />and/or additions set forth in these "Specifications" General Condi- <br />tions. <br />SCG-02 Drawings and Specifications <br />These General Conditions together with the attached specifications and <br />all drawings to which the CONTRACTOR is referred by the specifica- <br />tions, are intended to illustrate the work required under the con- <br />tract. Drawings and specifications are complimentary and what is <br />called for by one shall be as binding as iF called for by both. <br />Should the drawings and specifications be contradictory in any parti- <br />cular way or should there be apparent errors in either, or should <br />there be any doubt as to the meaning of either, the CONTRACTOR shall <br />refer [he matter to the engineers whose decision thereon shall be <br />binding upon all parties. <br />1 <br />• <br />Figures sha1L have precedence over seated meaurements, and details <br />over general drawings. <br />S-2 <br />- -- _ _, <br />
The URL can be used to link to this page
Your browser does not support the video tag.