Laserfiche WebLink
Truck Travel (Haul & Return) Time: Road Condition: Hard, smooth, stabilized, surfaced, watered, <br />maintained 2.0 <br />Haul Route: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade (%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />5144.00 <br />3.00 <br />2.00 <br />5.00 <br />1550 <br />3.589 <br />Haul Time: 3.589 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade (%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />5144.00 <br />-3.00 <br />2.00 <br />-1.00 <br />3503 <br />1.514 <br />Return Time: <br />Total Truck Cycle Time: <br />1.514 <br />8.583 <br />minutes <br />minutes <br />Loading Tool unit <br />Production 4,603.46 LCY/Hour Adjusted for job efficiency: 3,820.87 LCY/Hour <br />Truck Unit Production <br />1,222.71 LCY/Hour Adjusted for job efficiency: 1,014.85 LCY/Hour <br />Optimal No. of Trucks: 4 Truck(s) Selected Number of Trucks: 4 Truck(s) <br />Adjusted hourly truck team production: 4,059.39 LCY/Hour <br />Adjusted single truck/loader team production: 3,820.87 LCY/Hour <br />Adjusted multiple truck/loader team production: 3,820.87 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.227 /LCY <br />Total job time: 2,061.05 Hours <br />Total job cost: $9,664,366 <br />