Laserfiche WebLink
UUI.UJIIJI I CI IVCIUpt!IU..7V V LJ I UOr-%-/-OF-YG I U-MOL,U-LJDDr/I.JOUCF1l. <br /> sources, sub-trades, combinations of sub-trades, building systems, Bid Packages or <br /> combinations thereof.The specific cost coding structure, estimating guidelines, assumptions, and <br /> contents of the cost estimates shall be mutually resolved between the Contractor and the Principal <br /> Representative prior to development of the first cost estimate to assure that estimates developed <br /> by all parties can be compared and reconciled. Lump sum estimates are not acceptable. <br /> Differences between the OPCC and the Independent Cost Estimate will be compared and <br /> reconciled through the Principal Representative. <br /> 3.4.8 During the preparation of each OPCC, the Contractor shall notify the Principal Representative if <br /> it appears that the OPCC will exceed the applicable portion of the Fixed Limit of Construction <br /> Cost, satisfactorily demonstrate the accuracy of its estimate in such detail as shall be reasonably <br /> required by the Principal Representative, and make reasonable recommendations for corrective <br /> action consistent with the Fixed Limit of Construction Cost. The Contractor shall submit OPCCs <br /> to the Principal Representative for review and acceptance. Concurrently, the Contractor shall <br /> provide copies to the Design Consultant for review and verification. <br /> 3.4.9 The Principal Representative shall reasonably cooperate with the Contractor to keep the Work <br /> within the applicable portions of the Fixed Limit of Construction Cost, including, but not limited to, <br /> the giving of appropriate and reasonable consideration to all reasonable recommendations of the <br /> Contractor, approving redesign, providing constructability reviews and reports, deductive <br /> alternatives or reductions in Work, requesting additional Value Engineering, making Modifications <br /> to the Contract Documents or exercising such other rights or remedies as may be available <br /> elsewhere under this Agreement including termination for convenience. However, the Principal <br /> Representative shall be under no duty to reduce the Work to accommodate for any construction <br /> contingency used to cover costs to correct errors, omissions, mistakes or rejected Work. <br /> 3.4.10 The Design Consultant, by the terms of its agreement with the Principal Representative, is <br /> obligated to provide reasonable cooperation to the Contractor in the development of OPCCs and <br /> each LLTP CAP and Construction CAP proposal. Conversely, the Contractor, by the terms of this <br /> Agreement is obligated to provide reasonable cooperation to the Design Consultant in the <br /> development of OPCCs, each LLTP CAP and Construction CAP proposal. Additionally, both <br /> Design Consultant and Contractor are obligated to reconcile their respective cost estimates at the <br /> completion of each Bid Package including each LLTP CAP and Construction CAP proposal in a <br /> timely manner so as not to negatively impact the Project Schedule. <br /> 3.5 CM/GC SERVICES <br /> 3.5.1 During Project development, the Contractor shall review conceptual design; advise on-site use <br /> and improvements, selection of materials, building systems, and equipment; and provide <br /> recommendations on construction feasibility, availability of materials and labor, local construction <br /> activity as it relates to schedules, and time requirements for installation and construction. <br /> 3.5.2 The Contractor shall perform those services included, but not limited to, those designated as <br /> "Required" in Exhibit A, CM/GC Roles and Responsibilities Matrix. In addition and not in limitation, <br /> the Contractor shall also perform the other CM/GC Services designated in this Article. <br /> 3.5.3 The Contractor shall review the Drawings, Plans, and Specifications as they are prepared, <br /> recommending alternative solutions whenever design details affect construction feasibility, <br /> schedules or cost; however, nothing contained in this paragraph shall be construed to require the <br /> Contractor to provide Design Services. Written reviews will be submitted with redlined drawings, <br /> plans, and specifications after each Milestone. <br /> 3.5.4 The Contractor shall make recommendations to the Principal Representative and the Design <br /> Consultant regarding the division of Work in the Drawings, Plans, and Specifications to facilitate <br /> the bidding and awarding of subcontracts, allowing for phased construction and funding, if <br /> Page 15 of 75 <br />