<br /> 2.63 "Risk Management Plan" means the agreed to plan which includes risk identification, assessment,
<br /> and completion of a Risk Register detailing risks, mitigation, and the assigned responsibility for
<br /> each risk.
<br /> 2.64 "Risk Register" means a listing of risks and opportunities, risk assessments, and an evaluation of
<br /> mitigation and responsibility for those risks.
<br /> 2.65 "Samples" are physical examples which illustrate materials, equipment, or reasonable workmanship,
<br /> and establish standards by which the Work shall be judged.
<br /> 2.66 "Schedule of Bid Items" is part of the Contract Documents for any LLTP CAP or Construction CAP
<br /> proposals, which includes an itemized description of the Work by division and section of the
<br /> Specifications. The format will be an electrical EBS file submitted to the Principal Representative
<br /> by floppy disk, flash drive, CD, or electronic submittal.
<br /> 2.67 "Shop Drawings" are drawings, diagrams, schedules, and other data specifically prepared for the
<br /> Work by the Contractor or any Sub-contractor of any tier, manufacturer, Supplier, or distributor,
<br /> to illustrate some portion of the Work.
<br /> 2.68 "Specifications" means the detailed, exact statement of particulars, especially statements prescribing
<br /> materials and methods; and quality of Work for any LLTP or Construction Phase, which are
<br /> attached in any Exhibit D and include, but are not limited to, Project special provisions and
<br /> standard special provisions.
<br /> 2.69 "Standard Specifications" means the provisions in the Standard Specifications for Road and Bridge
<br /> Construction issued 2019.
<br /> 2.70 "State" means the State of Colorado.
<br /> 2.71 "Subcontracting Plan" means the plan developed by the Contractor which outlines the Contractor's
<br /> expected approach to subcontracting, including promoting disadvantaged and small business
<br /> participation, in the Construction Phase of the Project. The Subcontracting Plan shall detail the
<br /> opportunities that the Contractor has identified for possible participation by ESBs and DBEs.
<br /> The Subcontracting Plan shall be included in each Bid Package prepared by the Contractor and
<br /> may be considered by CDOT when determining the goal for DBE participation to be applied to
<br /> the Construction Phase.
<br /> 2.72 "Subcontractor" means a person, firm, or corporation supplying labor and materials, or only labor, for
<br /> all or any portion of the Work, under separate contract or agreement with the Contractor.
<br /> 2.73 "Substantial Completion" or"Substantially Complete" mean the stage in the progress of the Work for
<br /> any LLTP or Preconstruction Phase when the procurement or CM/GC Services are sufficiently
<br /> complete, in accordance with the Contract Documents as modified by any Amendment or Change
<br /> Order, so that the Work, or at the discretion of the Principal Representative, any designated
<br /> portion thereof, is available for its intended use by the Principal Representative and a Notice of
<br /> Substantial Completion for such phase can be issued. Portions of the phase may, at the discretion
<br /> of the Principal Representative, be designated as Substantially Complete.
<br /> 2.74 "Superintendent" means the Contractor's authorized employee held responsible in charge of the
<br /> Work.
<br /> 2.75 "Supplier" means any manufacturer, fabricator, distributor, material man or vendor.
<br /> 2.76 "Term" means the term of the Agreement, which shall commence as set forth in Section 6.1,
<br /> Commencement, and shall end on the final completion date of the Project pursuant to Article 15.