Laserfiche WebLink
UUI.UJlyl I CI IvmupC IL). .7UOU I LIOr-I.LOC-`FL I U-MJL/U-Ljoor/%-JOUCMI.. <br /> 1 <br /> 2.11 "Construction Phase" means the phase of Work performed by the Contractor in the construction of <br /> the Work from award of construction contracts for any Bid Package until the final acceptance of <br /> such Bid Package by CDOT. Construction Phase excludes all Design Services. <br /> 2.12 "Contract Documents" means, collectively, the following documents: <br /> 2.12.1 The exhibits of the Agreement that are attached hereto and incorporated herein: <br /> 2.12.1.1 Exhibit A, Contractor's Preconstruction Roles and Responsibilities <br /> ("Contractor's Preconstruction Roles and Responsibilities Matrix"); <br /> 2.12.1.2 Exhibit B.1, Contractor's Certificate of Liability Insurance ("Certificate of <br /> Liability Insurance"); <br /> 2.12.1.3 Exhibit B.2, Contractor's Certification ("Contractor's Certification");and <br /> 2.12.1.4 Exhibit C, Contractor's CM/GC Price Proposal (Form B-3, CM/GC <br /> Management Price Percentage Required Information, emailed by <br /> Contractor to Owner on October 15, 2020). <br /> 2.12.1.5 Exhibit D, Sample Contract Amendment. <br /> 2.12.1.6 Exhibit E, The United States Department of Transportation (USDOT) <br /> Standard Title VI/Non-Discrimination Assurance -Appendix A& E <br /> 2.12.2 The following documents are incorporated by reference and made a part of the terms <br /> and conditions of this Agreement: <br /> 2.12.2.1 The Department's Standard Specifications for Road and Bridge <br /> Construction 2019 ("Standard Specifications"); <br /> 2.12.2.2 Request for Proposal dated August 20, 2020, Request for Proposal <br /> Addendum 1 dated August 25, 2020, and Request for Proposal <br /> Addendum 2 dated August 27, 2020, and Contractor's Proposal including, <br /> but not limited to, the technical proposal and Contractor's Cost Model <br /> Approach, dated September 9, 2020, and the price proposal documents <br /> including Exhibit C (collectively, the "Proposal") CDOT received on <br /> October 15, 2020; and <br /> 2.12.3 Contract Amendment(s) (incorporating Bid Packages) Exhibits that will be attached <br /> hereto and incorporated by reference herein when executed, after a successful CAP <br /> negotiation: <br /> 2.12.3.1 Exhibit D.1, For the LLTP Bid Package including all CAP documents, <br /> Drawings, Plans and Specifications including addenda and Modifications <br /> (when approved by the Principal Representative). <br /> 2.12.3.2 Exhibit D.2, Performance Bond ("Performance Bond"); <br /> 2.12.3.3 Exhibit D.3, Payment Bond ("Payment Bond"); and <br /> 2.12.3.4 Exhibit DA Insurance Certificate ("Insurance Certificate"). <br /> 2.12.4 The following documents will be incorporated by reference and made a part of the <br /> terms and conditions of this Agreement upon issuance by the Principal <br /> Representative: <br /> 2.12.4.1 Exhibit F, Contractor Performance Evaluation Report ("Contractor <br /> Performance Evaluation Report"); <br /> 2.12.4.2 Exhibit G, Notice to Proceed to Commence CM/GC Services ("Notice to <br /> Proceed to Commence CM/GC Services"); <br /> 2.12.4.3 Exhibit H, CDOT Acceptance Letter for LLTP CAP or CM/GC Services <br /> (each a "CDOT Acceptance Letter"); <br /> 2.12.4.4 Exhibit I, Notice of Substantial Completion for LLTP CAP or CM/GC <br /> Services (each a "Notice of Substantial Completion"); and <br /> 2.12.4.5 Exhibit J, Notice of Final Settlement ("Notice of Final Settlement"). <br /> 2.13 "Contract Goal" means the goal for DBE participation that the Department determines should <br /> appropriately be met by the selected contractor, based on the type of work included in each project <br /> Page 5 of 75 <br />