My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-23_PERMIT FILE - M2021014 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021014
>
2021-02-23_PERMIT FILE - M2021014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 7:46:46 AM
Creation date
2/24/2021 7:31:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021014
IBM Index Class Name
PERMIT FILE
Doc Date
2/23/2021
Doc Name
Application
From
Castle Rock Construction Company of Colorado
To
DRMS
Email Name
TC1
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br /> RECLAMATION PLAN <br /> COUNTY: Cheyenne <br /> OPERATOR: Castle Rock Construction Company of Colorado, LLC <br /> 1. 6-10" of topsoil is currently present on the site and will be stripped and <br /> stockpiled. <br /> 2. The final slopes will be a maximum of 4:1 or flatter. Final slopes, both new and <br /> existing that are disturbed, will be reclaimed, seeded and mulched utilizing the <br /> attached seed and mulch plan that is specified on the highway project adjacent to <br /> the pit. No blanket or mulch tackifier is anticipated to be necessary. <br /> 3. The final use of the pit is rangeland. <br /> 4. No trees or shrubs will be removed from the rangeland. <br /> 5. No streams, roads or building will be affected after reclamation. <br /> 6. Temporary berms will be removed as reclamation progresses. <br /> 7. Salvaging and placing all existing topsoil will create a good seed bed. <br /> 8. Seeding will be performed in 2 different directions and will also double the rate of <br /> seed. Mulch will then be applied to all seeded areas. <br /> 9. The seeding will be done by the fall of 2021,probably at the same time as the <br /> roadway project. A preparation and seeding list are attached in this Exhibit. The <br /> site will be loosened by discing after the topsoil is replaced and prior to seeding. <br /> 10. Prior to the seeding and mulching process, the reclaimed soil will be tested to <br /> determine the need for fertilizer. The test results will be discussed with the <br /> County FSA office for recommendations. <br /> 11. The following seeding plan and all the conditions required in that plan will be <br /> utilized in the reclamation of the pit as necessary. <br /> a. Seeding Application: Drill Seed 0.25"to 0.5" into the soil. <br /> b. Mulching Application: Apply a minimum of 2 tons of certified weed free <br /> straw per acre mechanically crimpled into the soil. <br />
The URL can be used to link to this page
Your browser does not support the video tag.