Laserfiche WebLink
MINING PLAN EXHIBIT D(CONT) <br /> conveyors, crushers and screen plants . No blasting will take <br /> place at this mine. <br /> As much as possible, the surface drainage will be main- <br /> tained in the same direction as it now exists . The proposed <br /> sloping plan for the excavated area should eliminate any <br /> concerns of erosion occurring on the site. <br /> On a typical operation of this type we may use 2 to 3 ac- <br /> ft of water per year. Most of the water used for dust control <br /> will be used on haul roads . Please refer to EXHIBIT G -WATER <br /> for the discussion of how water will be used at the site and <br /> the source of said water. <br /> There are no ditches crossing the site and no surface or <br /> subsurface water will be impacted by the mining operation. All <br /> interior pit slopes will be maintained with a pit-ward attitude <br /> so that historic drainage patterns can be maintained. This <br /> same slope management plan will prevent any offsite slides or <br /> other disruptions . Isolation berms or ditches will be con- <br /> structed around the active mining area to prevent stormwater <br /> from contacting the disturbed area. All stormwater contacting <br /> the disturbed area will be retained on site and allowed to <br /> evaporate or soak into the underlying gravel. No U.S . Army <br /> Corps of Engineers, 404 permit is necessary, as there are no <br /> water bodies on the site nor are there any wetland areas . <br /> MINING TIMETABLE <br /> This estimated mining timetable is based on an average <br /> year and Walsenburg Sand and Gravel, CO. expects a specific <br /> year to vary widely from the average. If there are changes in <br /> the mining timetable we will discuss the reasons for the change <br /> in the annual report that follows the change and modify it at <br /> that time. <br /> ESTIMATED MINING TIMETABLE (revised October 2020) <br /> ACRES ± <br /> OPTION ESTIMATED TOTAL TOTAL MINED MINED <br /> YEARS AREA MINED 100% SLOPES <br /> #1 15-25 46. 91 35 .73 32 . 18 3 . 55 <br /> 2 15-25 46 . 91 35 . 73 32 . 59 . 14 <br /> W56- Hribar Pit Amendment 13 November 2020 <br />