My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-19_PERMIT FILE - M2021013
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021013
>
2021-02-19_PERMIT FILE - M2021013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 7:41:32 AM
Creation date
2/22/2021 7:42:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021013
IBM Index Class Name
Permit File
Doc Date
2/19/2021
Doc Name
Application
From
Ames Construction, Inc.
To
DRMS
Email Name
AME
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C <br /> The haul road through the permitted site and the area of borrow <br /> excavation are the only components of the mining operation. <br /> Once the topsoil has been salvaged and the haul road <br /> constructed, excavation/hauling operations will begin. The <br /> borrow material will be excavated using large backhoes/loaders <br /> and placed directly into truck-trailer hauling units for <br /> transporting to the job site on Lemay Avenue. <br /> Excavation of the borrow materials will proceed in a east to <br /> west direction. The side slopes of the final excavation are to be <br /> at a maximum gradient of 3:1 (horizontal to vertical). As the <br /> borrow material is being removed, the excavation in the area of <br /> the final slopes will be done at this 3:1 gradient. <br /> (f) Dimensions of land disturbance. <br /> The area of land disturbance is in a trapezoid configuration. <br /> The width of the ends of the trapezoid are 32 feet and 599 feet. <br /> The length of the trapezoid is 1200 feet. These dimensions <br /> result in an area of 8.7 acres of active mining area. <br /> (g) Haul road dimensions. <br /> A small haul road will be built for the mining area from North <br /> County Road 5J and is already included in our permit boundary <br /> area. <br /> (h) Water use. <br /> The only water to be used in conjunction with the borrow site <br /> operation, will be water applied to the on-site roads for dust <br /> control. Approximately 8,000 gallons of water per day will be <br /> used for dust control. The source of this supply will be the same <br /> as the project's water source along Lemay Avenue in Fort <br /> Collins. <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.