Laserfiche WebLink
�pfCO <br /> M 1982-112 TR05 <br /> * COLORA complied! o violations 4ING AND SAFETY <br /> 131: 5 Minor Infractions AME/maclawa 866-356RECEIV'ED <br /> FEB i (j 2021 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> 1982-112 Miller Gravel Pit ,0 M <br /> File No.: M- Site Name: <br /> County Elbert TR# (DRMS Use only) <br /> Permittee: Schmidt Construction Company <br /> Operator(If Other than Permittee): Same <br /> Permittee Representative: M a rk A. H e if n e r <br /> Please provide a brief description of the proposed revision: <br /> To change the reclamation seed mixture to be more suitable to the final land use and the <br /> GOndkoOns at the site. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />