Laserfiche WebLink
Truck Travel(Haul&Return)Time: Road Condition:Hard,smooth,stabilized,surfaced,watered, <br /> maintained 2.0 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 5144.00 3.00 2.00 5.00 1550 3.589 <br /> Haul Time: 3.589 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 5144.00 -3.00 2.00 -1.00 3503 1.514 <br /> Return Time: 1.514 minutes <br /> Total Truck Cycle Time: 8.583 minutes <br /> Loading Tool unit <br /> Production 4,603.46 LCY/Hour Adjusted for job efficiency: 3,820.87 LCY/Hour <br /> Truck Unit Production <br /> 1,222.71 LCY/Hour Adjusted for job efficiency: 1,014.85 LCY/Hour <br /> Optimal No.of Trucks: 4 Truck(s) Selected Number of Trucks: 4 Truck(s) <br /> Adjusted hourly truck team production: 4,059.39 LCY/Hour <br /> Adjusted single truck/loader team production: 3,820.87 LCY/Hour <br /> Adjusted multiple truck/loader team production: 3,820.87 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 2,355.49 Hours <br /> Unit cost: $1.227 /LCY Total job cost: $11,044,990 <br />