My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-17_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2021-02-17_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 2:03:50 PM
Creation date
2/17/2021 1:54:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
2/17/2021
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company L.P
Type & Sequence
MR230
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Reclaim the Additional Collom Spoil <br /> Site: Colowyo Coal Mine Permit Action: MR230 Permit/Job#: C1981019 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 2/17/2021 County: Moffat Filename: C019-000 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Load,Haul and Regrade Collom Pit TRUCKI 1 2,355.49 $11,044,990 <br /> SUBTOTALS: 2355.49 $11,044,990 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $223,109 <br /> Performance bond: 1.05 Total= $115,972 <br /> Job superintendent: 1,177.75 Total= $81,912 <br /> Profit: 10.00 Total= $1,104,499 <br /> TOTAL O&P= $1,525,492 <br /> CONTRACT AMOUNT(direct+O&P)= $12,570,482 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $0 Total= $0 <br /> Engineering work and/or contract/bid preparation: 2.00 Total= $251,410 <br /> Reclamation management and/or administration: 1.91 $240,096 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $2,016,998 <br /> TOTAL BOND AMOUNT(direct+indirect)= $13,061,988 <br />
The URL can be used to link to this page
Your browser does not support the video tag.