Laserfiche WebLink
Truck Travel (Haul & Return) Time: Road Condition: Hard, smooth, stabilized, surfaced, watered, <br />maintained 2.0 <br />Haul Route: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade (%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />1580.00 <br />-9.00 <br />2.00 <br />-7.00 <br />1411 <br />1.320 <br />Haul Time: 1.320 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade (%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />1580.00 <br />9.00 <br />2.00 <br />11.00 <br />1734 <br />1.314 <br />Return Time: <br />Total Truck Cycle Time: <br />1.314 <br />6.114 <br />minutes <br />minutes <br />Loading Tool unit <br />Production 4,603.46 LCY/Hour Adjusted for job efficiency: 3,820.87 LCY/Hour <br />Truck Unit Production <br />1,716.50 LCY/Hour Adjusted for job efficiency: 1,424.70 LCY/Hour <br />Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: 3 Truck(s) <br />Adjusted hourly truck team production: 4,274.09 LCY/Hour <br />Adjusted single truck/loader team production: 3,820.87 LCY/Hour <br />Adjusted multiple truck/loader team production: 3,820.87 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $0.982 /LCY <br />Total job time: 632.37 Hours <br />Total job cost: $2,372,471 <br />