Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br /> Annual Reclamation Report for Calendar Year — 2020 <br /> Deserado Mine C-1981-018 © Blue Mountain Energy, Inc. p <br /> Mine Name Permit Number Permittee <br /> 3607 County Road 65 Rangely, CO 81648 <br /> Address <br /> This report,required by Rule 2.04.13,is due by February 15 of each year,or other date,as agreed upon by the Division. It should include text, <br /> discussion,and maps,at a minimum,in addition to any other reclamation monitoring data as required by the approved permit. The location of the <br /> acreage reported under each land status category and year of seeding(if applicable)should be clearly identified on a map included with the report. <br /> Last Year's Cumulative Total This Calendar YearLand Category s ARR Cumulative Total <br /> (from last year's ) Acres Added(+) Acres Subtracted(-) <br /> Acreage in Active <br /> Mining Areas N/A N/A N/A = N/A <br /> Last Year's Cumulative Total This Calendar Year <br /> Land Category s ARR Cumulative Total <br /> (from last year's ) Acres Added(+) Acres Subtracted(-) <br /> Acres Disturbed' 545.9981 39.54 0 = 585.5381 <br /> Acres Backfilled and <br /> Graded 168.98 3.42 0 = 172.40 <br /> Acres Topsoiled 168.98 3.42 0 = 172.40 <br /> Acreage in Long-term Last Year's Cumulative This Calendar Year <br /> Facilities' Total Acres Added(+) Acres Subtracted(-) Cumulative Total <br /> (from last ear's ARR) <br /> Non-Permanent Facilities 545.9981 39.54 0 = 585.5381 <br /> Permanent Facilities O 0 0 = 0 <br /> (permitted) <br /> Totals 545.9981 = 585.5381 <br /> Acres Seeded Last Year's Cumulative Total This Calendar Year <br /> Cumulative Total <br /> (permanent) (from last year's ARR) Acres Added(+) Acres Subtracted(-) <br /> 9 Years and Less 38.04 3.42 4.32 = 37.14 <br /> 10 Years and Greater 130.94 4.32 0 = 135.26 <br /> Totals 168.98 = 172.40 <br /> Last Year's Cumulative Total This Calendar Year <br /> Bond Release s ARR Cumulative Total <br /> (from last year's ) Acres Added(+) Acres Subtracted(-) <br /> Phase I Released 0 0 0 = 0 <br /> Phase II Released 0 0 0 = 0 <br /> Phase III Released 0 0 0 = 0 <br /> Includes pits,topsoil stripped areas in advance of pits,and spoil not backfilled and graded <br /> '-Surface Mine Acres Disturbed=B&G+Long-Term Facilities+Active Mining Areas;Underground Mine Acres Disturbed=B&G+Long- <br /> Term Facilities;Separately-permitted Loadouts=B&G+Long-Term Facilities <br /> 'Includes haul,access and light-use roads,temporary dams and impoundments;permanent dams and impoundments;diversion and collector ditches, <br /> water and air monitoring sites;topsoil stockpiles;overburden stockpiles;repair, storage and construction areas; office area,repair shops, and <br /> parking;coal stockpiles,loading,and processing areas;railroads;coal conveyors;refuse piles and coal mine waste impoundments;head-of-hollow <br /> fills;valley fills;ventilation shafts and entryways;and non-coal waste disposal area(garbage dumps and coal combustion by-products disposal <br /> areas). <br /> February 8,2019 <br />