Laserfiche WebLink
T <br /> • 2. In the incompleteness response dated October 28, 2020, the operator states that <br /> no trucks will use the new mine entrance. Please clarify how heavy equipment will <br /> access the site given the amount of reclamation work remaining to be done at the <br /> site. <br /> ➢ Response: <br /> ✓ The new entrance will not be used for aggregate trucks hauling from this <br /> site. Construction trucks will be using this entrance to deliver equipment to <br /> complete the water storage project. <br /> ✓ All operating traffic for the water storage project in the future will be using <br /> the new entrance. <br /> ✓ At times it may be allowed by Aggregate Industries to access the site through <br /> the ready-mix plant site. <br /> • Exhibit A —Legal Description (Rule 6.4.1) <br /> ➢ Response: <br /> No change to the legal description. <br /> • 3. Please provide the missing mine entrance location coordinates. <br /> ➢ Response: <br /> Please see our first response above which show the mine access point <br /> coordinates. <br /> Exhibit B—Index Map (Rule 6.4.2) <br /> • 4. Please provide an updated Index Map that depicts the current approved permit <br /> boundary along with acreage. The map provided depicts the cement plant being in <br /> the permit boundary. <br /> ➢ Response: Reference, Pueblo East Pits, Amendment 5, Index Map 13-1 <br /> EXHIBIT C—Pre-mining and Mining Plan Map(s) of Affected Lands (Rule 6.4.3) <br /> ➢ Response: <br /> ✓ With the exception of new structures, we request the DRMS not require a <br /> new Exhibit D—Mine Plan Map. We agree new Pre-mine and Reclamation <br /> Maps are needed. Any new permanent, man-made structures will be shown <br /> on the new Pre-mine Map. <br /> ✓ In essence, this is a reclamation only permit amendment. <br /> ✓ No mining shall occur since all the available resource within Phases 1, 2 and <br /> 7 has been removed. Any material on the site will be used to meet backfill <br /> requirements. It would be more expensive to sell material, have it hauled off <br /> -site, then have to buy material and have it brought back onto the site. <br /> ✓ Backfilling and grading will occur using on-site, available material. <br /> 5 <br />