Laserfiche WebLink
1 <br /> ❖ The approved seed mix will be drill seeded and the area mulched with 2 <br /> tons per acre of weed-free straw, crimped into the soil surface in two <br /> directions. <br /> ❖ If only disking occurs, the area will be broadcast seeded at double the <br /> drill seed rate. No mulching will occur if the area is broadcast seeded. <br /> ✓ Please see the attached map for the location of the referenced Phases. <br /> • 12. Phase 2 Area—During the 2019 inspection it was noted that there were areas <br /> that needed weed management and reseeding. What is the anticipated total area that <br /> will require initial seeding and reseeding in the Phase 2 Area? <br /> ➢ Response: <br /> ✓ We propose to regrade and reseed on the Phase 2 area just north and west of <br /> Phase 1, approximately 9.0 acres. <br /> ✓ The regrading should initially remove the weed infestation. We will follow <br /> up with weed control in following years by using the currently approved <br /> weed control plan, Amendment 1, Exhibit E, Pages 14-15 as amended in <br /> subsequent permit revisions. <br /> • 13. Phase 2 Area— Will the areas that are seeded be crimped and mulched, if so at <br /> what rate? <br /> ➢ Response: <br /> ✓ The approved seed mix will be drill seeded and the area mulched with 2 tons <br /> per acre of weed-free straw, crimped into the soil surface in two directions. <br /> ✓ If only disking occurs, the area will be broadcast seeded at double the drill <br /> seed rate. No mulching will occur if the area is broadcast seeded. <br /> ✓ Please see the attached map for the location of the referenced Phases. <br /> • 14. Phase 1 Area—Has the Division of Water Resources (DWR) been consulted <br /> about pumping the water into the Arkansas River, if so, what were their comments? <br /> If they have not been consulted should they be, if not why? <br /> ➢ Response: The Division of Water Resources has been contacted and they have <br /> no comments concerning the return of water to the Arkansas River. <br /> • 15. Phase 1 Area— The material in the northwest corner of the phase consists of <br /> primarily of clean-out material from cement trucks and other large concrete debris. <br /> Please describe how this material will be broken up and used for backf ll. What is <br /> the estimated volume of this material? The Division would like the operator to <br /> commit to removing any exposed rebar and disposing of it at an appropriate <br /> landfill. <br /> ➢ Response: <br /> ✓ The concrete rubble is only waste from the concrete operation. It does not, <br /> nor has it ever had any rebar contained in the material. <br /> ✓ Offsite construction demolition concrete will not brought onto the site. <br /> ✓ Stockpile volume of rubble is approximately 16,156 cys <br /> 14 <br />