My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-12_REVISION - M1986015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986015
>
2021-02-12_REVISION - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:48:59 AM
Creation date
2/17/2021 6:15:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
REVISION
Doc Date
2/12/2021
Doc Name
Adequacy Review Response
From
Castle Aggregate
To
DRMS
Type & Sequence
AM5
Email Name
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r � <br /> Landowner Structure Distance to affected boundary-feet <br /> E30.Schedule:435001008 <br /> CULLEN CHRIS No structures? <br /> 1900 SAINT CHARLES RD <br /> PUEBLO CO 81006-9705 <br /> E31.Schedule:435003002 NO Structures <br /> 28 LANE LLC <br /> 129 COLOR-ADO AVE <br /> PUEBLO CO 81004-4213 <br /> • EXHIBIT D Mining Plan (Rule 6.4.4) <br /> ➢ Response: <br /> ✓ We request the DRMS not require a new Exhibit D—Mining Plan Map C-1 <br /> ✓ In essence, this is a reclamation only permit amendment. <br /> ✓ No mining shall occur since all the available resource within Phases 1, 2 and 7 <br /> has been removed. Any material on the site will be used to meet backfill <br /> requirements. It would be more expensive to sell material, have it hauled off- <br /> site, then have to buy material and have it brought back onto the site. <br /> ✓ Backfilling and grading will be completed using on-site, available material. <br /> • 7. Please confirm that no mining is expected to take place at the site but if mining <br /> does occur it will follow all relevant sections of the Mine Plan found throughout the <br /> approved amendments. <br /> ➢ Response: <br /> ✓ We confirm no mining is expected. <br /> ✓ If, in the unlikely event, additional mining is needed in order to complete site <br /> reclamation, we will follow the relevant sections of the mining plan's <br /> approved amendments. <br /> ✓ We propose any extraction of material which does not leave the site will be <br /> part of site reclamation. <br /> ✓ We agree to notify the DRMS if we have a need to export material from the <br /> site, so the DRMS may determine if a permit revision is required. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.