3653760 <br /> 3) All entry into the production casing for water lines and electric wiring shall be through watertight <br /> seals. <br /> 4) The well vault must be constructed to prevent contaminants from entering the well and shall <br /> comply with construction standards defined in Rules 11.6 and 11.6.1. <br /> 5) Ali electrical work shall comply with applicable standards and requirements of Rule 11.8.1. <br /> 6) The well construction must be performed or supervised by a licensed water well contractor or <br /> constructed by the owner with equipment both owned and operated by the owner. <br /> 7) The well must be constructed in compliance with the disinfection standards provided in Rule 15. <br /> 8) An annual water quality test is recommended if the well is to be used for human consumption. <br /> 9) Well Construction and Test Report form GWS-31 must be submitted within 60 days of completion <br /> of the well and a Pump Installation and Test Report form GWS-32 must be submitted within 60 <br /> days of installation of pumping equipment. <br /> Owners are also adyised that Rule 6.6 of the Well Construction Rules requires that the construction <br /> comply with any federal, state, county,municipal:or,lQcal government laws, regulations or codes that <br /> are more stringent than these Rules. This includes distance requirements from sources of <br /> contaminants and standards not covered by these Rules. <br /> Approval of this request does not relieve the owner of potential responsibility or liability in the event <br /> contamination of the water source results from construction, nor does the grantor assume any <br /> responsibility or liability should contamination occur. <br /> If you have any questions,,please.contact this office. <br /> Sincerely, , RECEIVED <br /> APR 16 2012 <br /> Matthew A. Sares, P.G. �sn40.5 <br /> Hydrogeological Services Manager C � <br /> cc: Heather Justus, Leonard Rice Engineers Inc. <br /> Permit File <br />