My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-08_PERMIT FILE - M2021009 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021009
>
2021-02-08_PERMIT FILE - M2021009 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 7:20:14 AM
Creation date
2/10/2021 7:02:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021009
IBM Index Class Name
PERMIT FILE
Doc Date
2/8/2021
Doc Name Note
Part 1 of 3
Doc Name
Application
From
Young Ranch Resource LLC
To
DRMS
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.4(e) <br /> Mining will be completed based on market conditions over up to five phases. Mining will begin <br /> with initial opening and the creation of the site processing area as Phase 1, followed by mining <br /> Phase 2 —the west extent of the quarry and development of the realigned CCP, and mining Phase <br /> 3 —the east extent of the site which further develops the Phase 1 area. Phases 4 and 5 will be <br /> mined if a post-mine reservoir is planned. Phases may be mined out of numerical order. Phase 3 <br /> mining may occur concurrently with other mining phases. Map C-2 shows the initial mining plan <br /> with projected phasing and F-1 features the Reclamation plan. <br /> The mining schedule is planned to minimize disturbance by reclaiming mined-out areas as new <br /> mining phases become active. Note: if large contracts are awarded to the site, production could <br /> increase and reduce the life of the quarry. Conversely, if contracts are less than anticipated, the <br /> life of the quarry could be extended. <br /> Approximate projected acreage, anticipated recoverable tons, duration of mining, and WRL <br /> acreages are shown in Table D-1 for each phase. To calculate anticipated recovered tons, a <br /> mining rate of one-million tons per year was used for Pre-mining/Opening and Phase 1 <br /> approximations. While for Phases 2—5, including bedrock and gravel mining, a rate of three- <br /> million mined tons per year was used to approximate the duration of mining. <br /> 6.4.4(e)(i) <br /> See Table D-1. <br /> 6.4.4(e)(ii) <br /> See Table D-1. <br /> 6.4.4(fl(i) <br /> Metamorphic rock blasting and mining will reach a depth of approximately 7,850-foot elevation. <br /> This is below the pre-mine ground surface even if Phases 4 and 5 are not mined(Map C-5). If a <br /> reservoir is chosen and/or Phases 4 and 5 are mined, the western half of the quarry will be mined <br /> to an elevation of approximately 7,535 feet while the eastern half of the quarry will be mined to <br /> Young Ranch Resource �.,�., .. ,,.«,,_V11.< <br /> February 2020 D-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.