Laserfiche WebLink
C 0 L 0 R A D 0 <br /> Division of Water Resources <br /> Department of Natural Resources <br /> February 4, 2021 <br /> Ms. Krystle Ervin <br /> Martin and Wood Water Consultants, Inc. <br /> 538 Commons Drive <br /> Golden, CO 80401 <br /> Re: St. Barbara Sand and Gravel Mine, Substitute Water Supply Plan <br /> DRMS Permit No. M-2004-013 <br /> Section 1, T21 S, R63W, and Section 6, T21 S, R62W, 6th P.M. <br /> Water Division 2, Water District 14 <br /> SWSP ID 4695, WD I D 1407803 <br /> Approval Period: January 1, 2021 — December 31, 2022 <br /> Contact for Ms. Ervin: 303-526-2600; KErvin@martinandwood.com <br /> Dear Ms. Ervin: <br /> We have received your October 30, 2020 letter requesting the renewal of a substitute water <br /> supply plan ("SWSP") in accordance with § 37-90-137(11) C.R.S., for a sand and gravel pit <br /> to be operated by the applicant, Trans Colorado Concrete (a division of Pete Lien & Sons, <br /> Inc.). The mine is permitted with the Division of Reclamation, Mining, and Safety under File <br /> No. M-2004-013. The $257 renewal fee has been received and given receipt no. 10007297. <br /> SWSP OPERATION <br /> The St. Barbara Sand and Gravel Mine is located in Section 1, Township 21 South, Range <br /> 63 West of the P.M. and Section 6, Township 21 South, Range 62 West of the 6th P.M. in <br /> Pueblo County. Mining at the St. Barbara Sand and Gravel Mine is projected to continue for <br /> approximately 25+ years. Currently there is no activity. However, at this time it is uncertain <br /> whether mining at the site will occur over the approval period and whether a slurry wall will <br /> be constructed. Therefore, five scenarios were considered. The maximum exposed water <br /> surface area in the five ponds located on the property is currently at 9.76 acres. This is the <br /> total exposed surface area during all months when mining is not in progress. <br /> Under Scenario A, Pond 5 will be actively mined during March through August of 2021 and <br /> 2022. During active mining, the total exposed groundwater will be reduced to 4.57 acres. In <br /> August 2021 and 2022, the total exposed groundwater will be expanded to 9.76 acres. Pond <br /> 5 will be dewatered via a dewatering trench when the cell is being actively mined. <br /> Operational losses will occur due to water retained in the mined product and water used for <br /> dust suppression. <br /> Under Scenario B, Pond 5 will be actively mined during March through August of 2022. <br /> During active mining, the total exposed groundwater will be reduced to 4.57 acres. In August <br /> ." I"�, �. �;.1'"e e t', Room 821 M M")„V ql m� W m p f O„'m,B 66, <br /> 6m 3 '1 <br /> / <br /> »' I <br /> , q <br /> 4 <br /> r <br /> I <br /> ;.w,a r«; „ u r,✓ 1, ;- a;,rr-,. " r, i rc ;„;c v,, c `, r,i r, r ,,:- s r r r„ <br /> w , i o <br /> � <br /> , <br /> z <br />