My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-01-26_INSPECTION - M2008076
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2008076
>
2021-01-26_INSPECTION - M2008076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:40:08 AM
Creation date
2/8/2021 8:26:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008076
IBM Index Class Name
Inspection
Doc Date
1/26/2021
Doc Name
Inspection Report
From
DRMS
To
Robinson Sons Gravel Pit No.1
Email Name
DC1
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: <br /> Robinson Sons Gravel Pit No. Permit Action: <br /> Site: 1 2021 Cost Permit/Job#: M2008076 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 1/22/2021 County: Las Animas Filename: M076-000 <br /> User: DC <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 3:1 Slopes for Southern Highwall DOZER 1 12.45 $4,061 <br /> 002 Grade stockpiles in Area 1 DOZER 1 6.50 $2,229 <br /> 003 Regrade all slopes to correct erosional issues DOZER 1 1.24 $425 <br /> 004 Breach Impoundment in Area 1 DOZER 1 1.08 $370 <br /> 005 level material in Area 2 DOZER 1 0.72 $247 <br /> 006 Spread topsoil over Area 1 SCRAPERI 1 9.99 $12,463 <br /> 007 Spread topsoil over Area 2 SCRAPERI 1 3.18 $3,952 <br /> 008 Demolition of scale and scale house DEMOLISH 1 10.00 $3,261 <br /> 009 Revegetate Affected Land REVEGE 1 27.00 $31,439 <br /> 010 Load trash SITEMAINT 1 0.00 $1,100 <br /> ENANCE <br /> Oil Mobilization MOBILIZE 1 7.22 $161381 <br /> SUBTOTALS: 79.38 $75,928 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $11534 <br /> Performance bond: 1.05 Total= $797 <br /> Job superintendent: 33.46 Total= $2,327 <br /> Profit: 10.00 Total= $7,593 <br /> TOTAL &P= $121251 <br /> CONTRACT AMOUNT(direct+O &P)= $8 8,179 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $31748 <br /> Reclamation management and/or administration: 5.00 $4,409 <br /> CONTINGENCY: 3.00 Total= $2,278 <br /> TOTAL INDIRECT COST= $231185 <br /> TOTAL BOND AMOUNT(direct+indirect)= $99,113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.