Laserfiche WebLink
ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Water Tanker,5,000 Gal. $92.56 1 $92.56 $92.56 <br /> Light Duty Pickup,4x4,3/4 T. $113.71 1 $113.71 $113.71 <br /> Fuel Tanker,6x4,210 HP $66.41 2 $132.82 $132.82 <br /> Generic 15-18 cy,6x4 $118.71 1 $118.71 $118.71 <br /> Subtotals: $457.80 $457.80 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: TRINIDAD <br /> Total one-way travel distance: 25.00 miles <br /> Average Travel Speed: 45.00 mph <br /> Total Non-Roadable Mob/Demob Cost* <br /> `*two round trips with haul rig: $15,872.79 <br /> Total Roadable Mob/Demob Cost** <br /> ** one round trip, :no haul ri $5 0 8.67 <br /> g <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.56 0.56 <br /> Return Time(Hours): 0.56 0.56 <br /> Loading Time(Hours): 1.25 NA <br /> Unloading Time(Hours): 1.25 NA <br /> Subtotals: 3.61 1.11 <br /> JOB TIME AND COST <br /> Total job time: 7.22 Hours <br /> Total job cost: $16,381 <br />