Laserfiche WebLink
Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 1.000 (DOZ-OC) <br /> Push gradient: 0.786 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.868 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4587 <br /> Adjusted unit production: 968.09 LCY/hr <br /> Adjusted fleet production: 968.09 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.354/LCY <br /> Total job time: 1.24 Hours <br /> Total job cost: $425 <br />