Laserfiche WebLink
Cynthia Parnow, geochemistry at Knight Piesold, conducted geochemical <br /> characterization of the feedstock material. The report is provided herein as Appendix <br /> D. <br /> All materials hauled to the site will be hauled from the site after processing as <br /> construction material or precious metal containing concentrate. No material will be <br /> disposed of on-site neither will any material be subject to long term weathering on- <br /> site. The anticipated life of any stockpiles is a maximum of 14 days. Concentrate <br /> will be sealed in 55-gallon drums. <br /> [6.4.21(15)] Construction Schedule Information <br /> No facilities are proposed that will contain, hold or used for disposal of <br /> material that has the potential to cause acid mine drainage. <br /> [6.4.21(16)] Quality Assurance and Quality Control (QAQC) <br /> Construction of the mill building, an industrial metal building, does not <br /> warrant an extraordinary QAQC program. <br /> [6.4.21(17)] Plant Growth Medium <br /> Reclamation will not require revegetation. If necessary, the grounds around <br /> the building will be graded and re-graveled in preparation for sale as a <br /> commercial/industrial property. <br /> [6.4.21(18)] Wildlife Protection <br /> Colorado Parks and Wildlife was contacted January 19, 2021 for a site visit <br /> and subsequent comments. The site visit has not been scheduled as of this <br /> application submission. It will be provided immediately upon receipt. <br /> [6.4.21(19)] Disposal of Tailings and Sludge in Mine Workings <br /> No materials will be disposed of in mine workings. <br /> Page 18 of 21 <br />