Laserfiche WebLink
6.3.2 Exhibit 6 <br /> Site Description <br /> The GTM will be constructed and operated on the historic disturbance of the <br /> Golden Nugget, Donna Juanita & Gladstone mines, south of I-70 and Clear Creek. <br /> The soils in the approximate four-acre mill area are primarily rock outcrop and <br /> historic mine spoils. The NRCS web soil survey and soil series descriptions are <br /> provided in herein. <br /> Permanent man-made structures within 200 ft. of the affected area include an <br /> Xcel Energy utility distribution poles. These structures are identified on Exhibit E and <br /> structure agreement are provided in Exhibit L. <br /> The Clear Creek streambed lies north of Stanley Road, north of the mill site. <br /> GTM is designed with a recirculating process water system. The wet processing <br /> component will be enclosed in a metal building. Mill process water will not be <br /> discharged from the site. <br /> Storm water will be conveyed from the site by way of the roadside ditches. <br /> The ditches will converge with the culvert and drainage system of Stanley Road. <br /> Stormwater run-off from mill structures and storage pads will be conveyed to sumps <br /> with gravel/sand traps. This storm water will be conveyed into the process water <br /> tank. <br /> Mr. Mark Lamb and Mr. Joseph Walter of CO Department of Parks and Wildlife <br /> were sent the draft site plan and mill description on January 19, 2021. A site visit is <br /> anticipated but not scheduled at the time of this application. <br /> Page 4 of 21 <br />