My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-05_REVISION - M2012004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012004
>
2021-02-05_REVISION - M2012004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:37:24 AM
Creation date
2/8/2021 7:16:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012004
IBM Index Class Name
REVISION
Doc Date
2/5/2021
Doc Name
Request For Amendment To Permit
From
Superior Oilfield Services Co., LTD
To
DRMS
Type & Sequence
AM2
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit E - Reclamation Plan <br /> The primary objective of the reclamation for this site is to return the reclaimed <br /> areas back into cropland to be dry land farmed as before. Reclamation will be <br /> completed on an on going bases in order to return the areas back over to the <br /> farmer as soon as feasibly possible.This will be accomplished by grading and <br /> sloping the mined areas with overburden stripped and placed during the mining <br /> process connecting the existing grade on the perimeter of the site to the mined <br /> areas to provide a grade suitable for farming as per agreement with Konig Ag Co. <br /> The west edge of the site will be daylighted through and connected to <br /> the existing grades.The other three sides will be sloped to a minimum 4:1 slope <br /> during the mining process and graded to match the floor of the site so as to be <br /> leveled and graded to drain to the west as per agreement with Konig Ag Co. <br /> Topsoil will then be placed on the reclaimed grades at a depth of 6"to then allow <br /> the areas to be returned for farming.There will be no seeding required as the <br /> farmer plans to immediately return the areas back to crops thereby doing the <br /> planting. <br /> The proposed crop land is compatible with the surrounding uses and is currently <br /> what the land is being used for. <br /> The operator will comply with applicable Colorado water laws governing injury <br /> to existing water rights and with applicable state and federal water quality and <br /> and dredge and fill laws and regulations. <br /> This operation will not impact any groundwater. <br /> The mining and reclamation plans have been designed to account for the safety <br /> and protection of wildlife at the mine site. <br /> Topsoil shall be removed and segregated from other soils.Topsoil piles will be <br /> stored in places and configurations to minimize erosion and located in areas <br /> where disturbance by ongoing operations will be minimized. Once stockpiled, <br /> topsoil shall be handled as little as possible.Stockpiles that remain in place for <br /> more than one growing season will be seeded to minimize erosion. <br /> The land will be revegetated back to crop land. <br /> No buildings will be impacted by this proposal. <br /> The operator will post appropiate signage at the entrance to the mine site.The <br /> permit area will be marked. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.