My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-05_REVISION - M2012004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012004
>
2021-02-05_REVISION - M2012004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:37:24 AM
Creation date
2/8/2021 7:16:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012004
IBM Index Class Name
REVISION
Doc Date
2/5/2021
Doc Name
Request For Amendment To Permit
From
Superior Oilfield Services Co., LTD
To
DRMS
Type & Sequence
AM2
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D <br /> Mining Plan <br /> This site has been mined under an approved 112 permit since 2014. It is <br /> being amended due to an increase in acreage increasing the minable <br /> acres from 27.16 to 39.36. Mining will be done in one phase as before <br /> mining from west to east and north to south.The western boundary <br /> has been daylighted through as previously planned and is currently <br /> being reclaimed to the point of release.The three remaining sides of <br /> the site will be mined at a minimum 4:1 slope allowing for farming <br /> when reclaimed with a 10 foot set back from the mining boundaries left <br /> in place.A truck scale has been added to the operation at the southeast <br /> corner of the site. <br /> Scrapers will strip the topsoil and overburden materials and place them <br /> in the designated areas for future use during reclamation.These areas <br /> are located at the south end of the permit area and on the west side. <br /> The topsoil will be seeded if left undisturbed for one growing season. <br /> Front end loaders will be used to tranport material from the <br /> embankment areas to the crusher or screening plants for <br /> processing.The finished materials will be stockpiled by stacking <br /> conveyors or front end loaders,which ever one is required. Material <br /> will be loaded with front end loaders into trucks to be transported <br /> from the site for sales. <br /> The operator may import material from other sites.The applicant is <br /> aware that in accordance with Rule 3.1.5 (9)of the Construction <br /> Material Rules and Regulations, if any offsite material is used as backfill <br /> a notorized letter will be submitted to the Division indicating the <br /> materials are inert.The applicant will supply such a letter to the <br /> Division if the applicant intends to use off site material as backfill.At <br /> this time no imported materials are anticipated. <br /> This operation will not impact surface or groundwater.Stormwater will <br /> be controlled on site and released in a controlled manner so as to not <br /> damage off site areas in accordance with the operation's stormwater <br /> management plan.Water will be purchased off site and hauled to the <br /> location if needed for dust control either for roads or processing. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.