Laserfiche WebLink
EXHIBI'I' D - Reclamation Plan <br /> Rule 6.3.4(Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E - Map. <br /> 1) Primary future (Post-mining)land use (check one): <br /> Cropland (CR) Pastureland (PL) General Agriculture (GA) <br /> Rangeland (RL) Forestry (FR) Wildlife Habitat (WL) <br /> Q Residential (RS) M Recreation (RC) Industrial/Commercial (IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> We will fill all cuts, pits or trenches we create with larger rocks first, then a mixture of soil and smaller <br /> rocks, capping it with the stored top soil only for future re-seeding. We will reclaim and reseed all <br /> ac . ss routLas that weare us d during our and prior mining operations in the part, at our cost_ <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertical): 2.4 H: 1 V <br /> (Note: If the Applicant proposes slopes steeper than 3H: l V(example 1 H.1 V, 2H. IV, etc.), please <br /> include a justification: <br /> Ridgetop Final Grade= 7H : 1V <br /> Conn for Fxisflng Grade = 1.5H i 1V -Connector Final Grade = 2AH : 1V _ <br /> a. Please provide a general description of the backfilling and grading: <br /> Backfilling will use larger racks first, then waste dirt. Final grading will utilize the topsoil we have <br /> in storage <br /> 4) De nth of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches El 6-8 inches <br /> 8-10inches 10-12inches <br /> Other. <br /> N/A, explain: <br /> Precautions are being taken to salvage and protect ALL topsoil. <br />