My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-04_PERMIT FILE - M2020057
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020057
>
2021-02-04_PERMIT FILE - M2020057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:33:54 AM
Creation date
2/8/2021 6:45:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020057
IBM Index Class Name
Permit File
Doc Date
2/4/2021
Doc Name
Incompleteness Response
From
Jeff A Carter
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D- Reclamation Plan <br /> Rule 6.3.4(Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E - Map. <br /> 1) Primary future(Post-mining) land use(check one): <br /> 14 Cropland(CR) 1 Pastureland(PL) General Agriculture (GA) <br /> Rangeland(RL) Forestry (FR) Wildlife Habitat(WL) <br /> n Residential (RS) Recreation(RC) Industrial/Commercial (1C) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> Waste rock will be removed and original grade reestablished <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertical): 180 H: 180 V <br /> (Note: If the Applicant proposes slopes steeper than 3H: 1 V(example I H:1 V, 2H: 1 V,etc.), please <br /> include a justification: <br /> We will match existing grades <br /> a. Please provide a general description of the backfilling and grading: <br /> recrade to existing slope <br /> 4) De th of topsoil to be salvaged (only for surface disturbances)(check one): <br /> 4-6 inches 6-8 inches <br /> 8-10inches RIO-12inchcs <br /> Other: <br /> N/A, explain: <br />
The URL can be used to link to this page
Your browser does not support the video tag.