Laserfiche WebLink
EXHIBIT C-Mining Plan <br /> Rule 6.3.3 <br /> The purpose of the mining plan is to describe how mining will affect the permit area for the duration of <br /> the operation. <br /> 1) Estimated dates of commencement: �urto I kl_ and completion: ! Awe) <br /> Note: Reclamation of all affected lands shall be completed within 12 months after issuance of the <br /> permit. An Operator possessing a 111(1)(b) Reclamation Permit must convert to the appropriate <br /> regular construction materials permit if extraction and export of materials from the site are not <br /> completed within 12 months after the issuance of the perm it. <br /> 2) Depth of topsoil to be salvaged (check one): <br /> 4-6 inches =6-8 inches <br /> 8-10 inches =10-12 inches <br /> Other: <br /> _Qr N/A, explain: <br /> 3) Description of how topsoil will be stockpiled and stabilized: <br /> khg DIoA '�r� +oc it -oho �o"d, enco Qklrac�tor� �iiar <br /> "^nAorl ,•..11 kae U—Sod -4a ?Nui-Lcl 3// SlopaS -i`or rorJornni;nn PI(?SD ZU <br /> Plon, <br /> 4) Thickness of overburden needed to be moved: 3 feet or N/A <br /> 5) Thickness of deposit to be mined: feet <br /> 6) How will the mine be accessed: CZ existing roads (Q)new roads will be created <br /> a. Please describe the existing roads: <br /> W')D rdot� '>> n MCA bind 2�u���. ROO& <br /> b. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements (note, new roads must be included in permitted acreage): <br /> 7) Will water be needed during the mining operation (check one): (0)Yes or(nJ No <br /> a. If yes, please describe the source of the water and ]low much water will be used during the <br /> operation: <br /> l,�kQr r igV4S Oho <br /> Q c,.rrn v-�t _l'tg*-,o4` ton`", -Tkn0. p rQ4c Dd i%.io 'is rp),3'kQ'. ��am eC Q 4'. <br />