Laserfiche WebLink
Rifle Gravel Pit #1 January 2021 (Amendment to File No_ M-2020-008) <br /> approved for one year, but the applicant may request renewal of the SWSP by repeating the <br /> application. <br /> There are no existing wells on the Rifle Pit property. Nearby wells that have been identified <br /> are located Figure 4 Exhibit C, using GIS data from the DWR-SEO. The closest operating <br /> wells are on the adjacent property to the north, owned by Colorado River Ranch, LLC but <br /> are over 600 feet from the mining permit boundary. The dewatering pipeline installations are <br /> temporary and should not impact these wells. If any impact is detected by the well owners, <br /> SCI will work with them to restore full function of said wells. Two other wells within 600 feet <br /> of the permit boundary have been identified but are unused. <br /> 8.4 Surface Water <br /> The Colorado River is generally located north of the mining area and comes as close as <br /> approximately 0.25-mile northwest of the mining area. The property currently has a return <br /> channel of the Last Chance Ditch, which generally bisects the property from east to west <br /> and discharges into the Colorado River. The Last Chance Ditch is located south of the <br /> property on the south side of Interstate 70. The wetlands that are on site were created by <br /> irrigation activities, see Section 4.3 discussion, and will likely disappear in a relatively short <br /> period of time following the onset of dewatering. An existing irrigation tailwater ditch runs <br /> across the property east to west and ultimately discharges into the Colorado River. This <br /> tailwater ditch will be realigned in the clean water diversion channel around the Rifle Pit <br /> property along the eastern and northern property boundaries. See Figure 4, Exhibit C, and <br /> drawings in Attachment A. <br /> 8.5 Water Management <br /> Incidental runoff moving away from pits and working areas will be controlled using standard <br /> stormwater Best Management Practices (BMPs). A Colorado Discharge Permit System <br /> (CDPS) Construction Stormwater Permit will be acquired from the CDPHE-WQCD prior to <br /> any discharge. See previous water handling discussions in this document. <br /> 8.6 Project Water Requirements <br /> Rule 6.4.7 requires the operator/applicant shall provide an estimate of the project water <br /> requirements including flow rates and annual volumes for the development, mining and <br /> reclamation phases of the project. The following subsections outline the estimated project <br /> water requirements estimating methods with a summary of the annual active mining and <br /> post-mining demands shown in Table 2 and Table 3, respectively. <br /> 8.6.1 Water Requirements During Mining Phase <br /> During active mining, depletions to the Colorado River will occur from water lost with mined <br /> aggregate (trucked offsite with mined aggregate) and water used for dust control. Depletions <br /> are not expected from evaporation associated with dewatering efforts; SCI plans to intercept <br /> any groundwater with perforated pipe and pump it to the dewatering pipeline without <br /> evaporation. Gravel pit operations also typically include domestic or commercial indoor <br /> uses; however, SCI expects to provide trucked water from offsite for indoor water use. <br /> 31 <br />