R!fie 4 i.imia('y L 1 , 13 de No M-2,0 20 :)08� <br /> -0.83 acres for temporary impacts associated with the installation of the dewatering <br /> pipeline. <br /> 1.3.2.5 Total Parcel Size <br /> 58.7 acres <br /> 1.4 Commodity to be Mined <br /> Approximately 3 Million tons of sand and gravel will be mined from the property to provide <br /> materials for future projects. The projected duration of the commercial mining activities is 5 <br /> to 7 years. <br /> 1.5 Legal Description of Project Area and Access Road <br /> The legal description of the project area and latitude and longitude of the access road are <br /> provided in Section 2.0. <br /> 1.5.1 Dewatering Pipeline <br /> SCI negotiated a temporary license agreement (Attachment B) with the Shideler's (Parcel <br /> 217908100527) to the east that will allow SCI to bury a 12" pipeline that will collect and <br /> convey pumped dewatered water to the Colorado River (Attachment A). <br /> 2 <br />