Laserfiche WebLink
Rifle Gravel P t #t January 2021 (Amendment to F.le No M-2020-008) <br /> 5.2.1.1 Topsoil and Overburden Handling 15 <br /> 5.2.1.2 Water Handling and Dewatering 16 <br /> 5.2.2 Mining Preparation (Phase 2) 19 <br /> 5.2.2.1 Topsoil and Overburden Handling 19 <br /> 5.2.2.2 Water Handling and Dewatering 19 <br /> 5.2.2.3 Schedule of Operations 20 <br /> 5.2.2.4 Explosives 20 <br /> 5.2.3 Mining Extraction (Phase 3—in 5 Stages) 20 <br /> 5.2.3.1 Stockpiling and Overburden Handling 20 <br /> 5.2.3.2 Water Handling and Dewatering 20 <br /> 5.2.3.3 Schedule of Operations 20 <br /> 5.2.4 Reclamation (Phase 4) 21 <br /> 5.3 Mining Timetable 21 <br /> 6.0 Exhibit E—Reclamation Plan 23 <br /> 6.1 Description and Types of Reclamation 23 <br /> 6.2 Post-Mining Land Use 23 <br /> 6.3 Implementation of the Reclamation Plan 23 <br /> 6.3.1 Topsoil Segregation, Preservation, and Replacement 23 <br /> 6.3.2 Final Grading 25 <br /> 6.3.3 Seeding 25 <br /> 6.3.3.1 Temporary Seed Mix 25 <br /> 6.3.3.2 Long-Term/Permanent Seed Mix 25 <br /> 6.3.4 Fertilization 25 <br /> 6.3.5 Revegetation 25 <br /> 6.3.6 Topsoiling 26 <br /> 6.4 Revegetation Success Criteria 26 <br /> 6.5 Noxious Weed Control 26 <br /> 6.6 Reclamation Plan Schedule 26 <br /> 6.6A Previously Disturbed/Unnecessary Areas 27 <br /> 6.6.2 Active Mining Areas 27 <br /> 6.7 Monitoring Reclamation Success 27 <br /> 7.0 Exhibit F—Reclamation Plan Map 28 <br /> 8.0 Exhibit G —Water Information 29 <br /> 8.1 Dewatering 29 <br /> 8.1.1 Dewatering Pumping Information 29 <br /> 8.2 Aquifers 30 <br /> 8.3 Groundwater 30 <br /> 8.4 Surface Water 31 <br /> iii <br />