My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-01-22_PERMIT FILE - C1981025
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981025
>
2021-01-22_PERMIT FILE - C1981025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 8:01:11 AM
Creation date
2/3/2021 11:11:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Permit File
Doc Date
1/22/2021
Doc Name
No. I Mine Seepage Control & Treatment Pond Plan
Type & Sequence
MR28
Section_Exhibit Name
Drawing D-2-5
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DITCH OVERFLOW <br /> / TO REFUSE POND <br /> P-9 TF�LL OpIA Z ♦' <br /> // <br /> 6" <br /> A O LE PIPE <br /> Oe�N ♦ 6° DI PRIM R)SPILLWA'� <br /> K AN <br /> 6 D� C PENS P E LW Y <br /> 0000 STOCKPIL I L NNEL TO <br /> / ° T-1 a <br /> 4" [)IA EMERGENCY SPILL I WAY / DITCH <br /> _ <br /> POND CLEANIN D-4 <br /> DISPOSAL A A <br /> � �. <br /> 00 <br /> � o � <br /> 7470 <br /> vGF� 7510 <br /> 190 <br /> G �G <br /> CH <br /> a PVG F � <br /> i <br /> � 75 0 <br /> � OPEN CHANNEL <br /> 530 <br /> 75 -- <br /> 7550 I - <br /> .5 <br /> I'I I .3' Min FB <br /> �I <br /> 5 Flow Depth (Max) <br /> 7560 <br /> - - <br /> SECTION G - <br /> 7570 NTS <br /> SHAFT <br /> BACKFILLED <br /> 1998 A <br /> MAIN POR L <br /> BACKFILLED 12' 55' <br /> 1998 <br /> —I.•_ �4 Min 1.5117 <br /> I, <br /> 28 reeboard b — -♦o <br /> I <br /> —ill— 3 — o D= FLOW DEPTH = 0.06' <br /> 5' 6' FREEBOARD = 0.3' <br /> TOTAL DEPTH 0.36' <br /> Varies 6' to 10' 7.6' Varies 5 1.5H:IV SIDE SLOPES <br /> SECTION D-D SECTION F-F <br /> Varies SECTION B-B SCALE I"=10' NTS <br /> SCALE I"=10' <br /> - 1I— <br /> _l <br /> AOC BACKFILL <br /> 1.5 I. <br /> 1' Min FB I'll_ .4' Min FB <br /> —_ 5 Flow Depth (Max) 0 Flow Depth (Max) <br /> RIPRAP - <br /> °° -T SECTION C-C SECTION E-E <br /> 6" DIA 36" CMP <br /> 000 000 6 <br /> PIPE -III SHAFT ACCESS °° ° SCALE I"=2' NTS <br /> o°o°o°o°o°o11 <br /> °o <br /> SECTION A-A <br /> SCALE I"=10' PIPE NOTES: <br /> I. A FOUR INCH DIAMETER PVC PIPE CONVEYS WATER FROM THE No. 3 MINE TO THE LONG POND. <br /> 2. A SIX INCH DIAMETER PVC PIPE CONVEYS WATER FROM THE NO. I MINE TO THE LONG POND. ` <br /> 3. THE LONG POND HAS A FOUR INCH DIAMETER PVC PIPE ON ITS WEST END THAT IS AN EMERGENCY \ <br /> SPILLWAY. <br /> 4. THE LONG POND'S PRIMARY SPILLWAY ON ITS EAST END IS A SIX INCH DIAMETER PVC PIPE THAT <br /> CONVEYS WATER TO TREATMENT POND T-1. <br /> 5. THE LONG POND ALSO HAS A FOUR INCH DIAMETER PVC PIPE ON ITS EAST END THAT IS AN <br /> EMERGENCY SPILLWAY. THE PIPE CONVEYS WATER TO POND T-1. <br /> 6. WATER FLOWS BETWEEN PONDS T-1 AND T-2 IN AN OPEN CHANNEL. <br /> 7. POND T-2 HAS TWO SIX AND ONE FOUR INCH DIAMETER PVC OUTLET PILES. ONE SIX INCH DIAMETER PIPE <br /> FUNCTIONS AS THE PRIMARY SPILLWAY. THE SECOND SIX INCH DIAMETER PIPE DIRECTS FLOW TOWARDS <br /> POND 9. THE FOUR INCH DIAMETER PIPE IS THE EMERGENCY SPILLWAY. <br /> 8. A PORTION OF THE SIX INCH DIAMETER PVC PIPE THAT CONVEYED FLOW TO OUTFALL 001 WAS <br /> REMOVED DURING 2011 AND REPLACED WITH A SECTION OF OPEN CHANNEL. �� NG 9�' CERTIFICATION PROJECT: M I N R E C, I N C <br /> 5 MR-28 Claify location of Pond 9 Emergency SpiNway and Outfall 001 (MT-08) J.E.S. 01121 9. THE OPEN CHANNEL DESIGN FOR SECTION C-C IS LOCATED IN VOLUME 111, APPENDIX 4-B, PAGE P-9-9. l he.- y tpat this drawing was done N <br /> LEGEND b e t��d# su ervision and <br /> z 4 Revise Pond 9 Emergency S illwa NOV CV-2014-001 J.E.S. 05 14 10. THE OPEN CHANNEL DESIGN FOR SECTION E-E IS LOCATED IN VOLUME 111, APPENDIX 4-B, PAGE P-9-I1. y ? TITLE: <br /> 9 y P y th the1 }}��?hiation prel�ented on <br /> 0 PERMIT BOUNDARY — � I G•=�- <br /> (n 3 Permit Renewal, Rev 4 emergency spillway, add 6 pipe to P-9 remove oerotoin ditch. J.E.S. O5 13 11. THE DESIGN FOR THE POND 9 EMERGENCY SPILLWAY IS LOCATED IN VOLUME 111, APPENDIX 4-B BEGINNING thi in is rue and correct-to the.� g y P y �. PP / W E NORTH THOMPSON CREEK MINES <br /> > TRAIL ON PAGE P-9-12. be s ,o,�"�'ry keno led a and belief <br /> w 2 Permit Renewal, Show Outfoll 001A and P-9 Spillways. J.E.S. 03 13 1W . 1�] �'� <br /> P ys PERMANENT POWERLINE s NO. I MINE SEEPAGE CONTROL & TREATMENT POND PLAN <br /> Digital Drawing <br /> 1 Convert to Di J.E.S. 0911 WATER TREATMENT PIPELINE — � � � - Jame i4(er o•• to <br /> 9 9 � Colora a► 23© �• ' <br /> No. DESCRIPTION: BY DATE LANDOWNER INSTALLED PIPELINE - - - - - PREPARED BY: pJea '�STOVER & ASSOCIATES I ONE INCH <br /> REFERENCES FLOW To REFUSE POND 2352 N 7TH ST. UNIT B DESIGNED BY: J.E.S. 01/18121 DRMS I.D. No. C - 1981 - 025 DWG. NAME: <br /> SHOWING FLOW DIRECTION Grand Jct., CO 81501 <br /> DRAWN BY: SCALE: D-2-5 <br /> CHECKED BY: 1 = 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.