My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-02_INSPECTION - C1981022
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981022
>
2021-02-02_INSPECTION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2021 10:39:18 AM
Creation date
2/3/2021 10:34:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Inspection
Doc Date
2/2/2021
Doc Name
Inspection Report
From
DRMS
To
Oxbow Mining, LLC
Inspection Date
1/27/2021
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 1,2021 C-1981-022/Elk Creek Mine LDS <br /> Inspection Topic Summary <br /> NOTE: Y Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection N -Roads <br /> N -Availability of Records N -Reclamation Success <br /> N -Backfill&Grading N -Revegetation <br /> N -Excess Spoil and Dev.Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish&Wildlife N - Support Facilities On-site <br /> N -Hydrologic Balance N - Signs and Markers <br /> R -Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N -Other N - Special Categories Of Mining <br /> N -Processing Waste N -Topsoil <br /> COMMENTS <br /> This was a partial inspection by Leigh Simmons of the Division of Reclamation,Mining and Safety(Division). <br /> Doug Smith of Oxbow Mining,LLC(Oxbow)accompanied the inspection. The weather was clear and dry,with <br /> snow on the ground.The status of the Elk Creek Mine is"active"however no coal is being mined and the only <br /> activity since the last inspection was site maintenance. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> The site was snow-covered.The main haul road up the Elk Creek drainage had been plowed to allow <br /> access to the methane generating facility(which was running at the time of the inspection),but other roads had not <br /> been plowed. <br /> There had been no recent disturbance at the mine. <br /> DOCUMENTS RECEIVED <br /> N/A <br /> OTHER(SPECIFY) <br /> N/A <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 5 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.