My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-01-28_REVISION - M1977306
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977306
>
2021-01-28_REVISION - M1977306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:24:58 AM
Creation date
2/1/2021 7:04:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977306
IBM Index Class Name
REVISION
Doc Date
1/28/2021
Doc Name
Executed SO
From
DRMS
To
Highbury Resources Inc.
Type & Sequence
SO1
Email Name
DMC
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3) Performance Warranty Form: The parry wishing to become Successor ("Prospective <br /> Successor") must agree to assume all liability for the reclamation of affected land, and <br /> must provide a Performance Warranty covering the same. See C.R.S. §§ 34-32-119 <br /> and 34-32.5-119. A Performance Warranty Form is included in this Application <br /> Packet. The Performance Warranty Form must bear the original notarized signature of <br /> an authorized representative of the Prospective Successor. <br /> 4) Financial Warranty: The Prospective Successor must provide Financial Warranties <br /> sufficient to cover the cost of completing reclamation in compliance with the Permit, <br /> the applicable Act and Rules. See C.R.S. §§ 34-32-119 and 34-32.5-119. In order to <br /> ensure the adequacy of the Financial Warranties, the Division must recalculate the <br /> required Financial Warranty whenever it receives an SO Application. Depending upon <br /> the state of the operation and the outstanding reclamation work, the Successor may be <br /> required to post a higher (sometimes significantly) or lower Financial Warranty than <br /> the Permittee currently has in place. <br /> The Division must act on all SO Applications within 30 days. See Hard Rock and <br /> Construction Materials Rule 1.12.1(2)(a). Since the Division cannot typically review <br /> the amount of the required Financial Warranty within this 30-day period, applicants <br /> have the following two options: <br /> Applicants may waive their right to receive a decision within 30 days. If the <br /> applicants waive their right to a decision within 30 days, the Division will <br /> recalculate the required Financial Warranty before issuing its decision on the <br /> Application. As a result, the Prospective Successor will know, prior to <br /> becoming Successor, whether the current Financial Warranty is adequate to <br /> cover the reclamation liability, or if the Financial Warranty must be increased. <br /> In this case, the Prospective Successor must submit the full Financial Warranty <br /> as part of the Application. <br /> Applicants may decide not to waive their right to a decision within 30 days. If <br /> the applicants choose not to waive their right to a 30-day review, the Division <br /> will review the Financial Warranty after issuing its decision on the Application. <br /> In this case, the Prospective Successor must submit a conditional replacement <br /> Financial Warranty in the amount of the Permittee's current Financial Warranty <br /> as part of the Application. <br /> If the Application is approved, the Division will conduct an inspection within <br /> 60 days to assess the amount of the reclamation liability. If the inspection <br /> reveals that the reclamation liability exceeds the amount of the conditional <br /> replacement Financial Warranty, the Successor must submit the difference <br /> within sixty days. Failure to meet this deadline may result in an enforcement <br /> action. If the inspection reveals that the reclamation liability is less than the <br /> conditional replacement Financial Warranty, the Successor may request a <br /> Financial Warranty reduction for release of the difference. <br /> - 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.